X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384281704030

Well Details

Well ID: 0384281704030
Loading map...
Location: 03/04-17-038-28W4/0
Location Alias: 03/04-17-38-28 W4M
Location Alias 2: 03/04-17-038-28 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 28
Section: 17
County/Municipality: Red Deer County
Well Name: VESTA CYGNET 4-17-38-28
Operator Name: Vesta Energy Ltd.
License Number: 0488708
License Date: 2018-04-03
License Status: Issued
Spud Date: 2018-05-18
Final Drill Date: 2018-06-01
Well Total Depth: 5539.00 m
Surface Hole Latitude: 52.287990
Surface Hole Longitude: -113.977547

For data sources see[1][2]

Well History

Date Event
2018-03-22 Conductor Casing Operation Performed
2018-04-03 Obtained License
2018-05-19 Surface Casing Operation Performed
2018-05-21 Direction Drilling Operation Performed - Deviate
2018-05-26 Direction Drilling Operation Performed - Horizontal
2018-06-01 Finished Drilling
2018-06-01 Well Log Performed
2018-06-01 Well Mode changed to Drilled and Cased
2018-06-03 Production Casing Operation Performed
2018-06-04 Rig Released
2018-07-22 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Jet Perforation
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-06 Perforation Treatment Performed - Jet Perforation
2018-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-08 Perforation Treatment Performed - Jet Perforation
2018-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Perforation Treatment Performed - Jet Perforation
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-10 Perforation Treatment Performed - Jet Perforation
2018-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-11 Perforation Treatment Performed - Jet Perforation
2018-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-13 Perforation Treatment Performed - Jet Perforation
2018-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-14 Perforation Treatment Performed - Jet Perforation
2018-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-15 Perforation Treatment Performed - Jet Perforation
2018-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-16 Perforation Treatment Performed - Jet Perforation
2018-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-17 Perforation Treatment Performed - Jet Perforation
2018-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-18 Perforation Treatment Performed - Jet Perforation
2018-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-19 Perforation Treatment Performed - Jet Perforation
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-20 Perforation Treatment Performed - Jet Perforation
2018-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-22 Perforation Treatment Performed - Jet Perforation
2018-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-23 Perforation Treatment Performed - Jet Perforation
2018-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-24 Perforation Treatment Performed - Jet Perforation
2018-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-06 Well Began Production
2018-11-06 Well Fluid changed to Crude Oil
2018-11-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-05-18 Trinidad Drilling Ltd. 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-05-21 1097.90 Deviate (5 - 79 degrees)
2018-05-26 2719.54 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-22 Perforation 5512.80 5513.10 16
2018-08-29 Perforation 5298.40 5299.00 16
2018-09-03 Perforation 4701.60 4701.90 16
2018-09-03 Perforation 4694.90 4695.20 16
2018-09-03 Perforation 4688.10 4688.40 16
2018-09-03 Perforation 4681.40 4681.70 16
2018-09-03 Perforation 4674.60 4674.90 16
2018-09-03 Perforation 4667.80 4668.10 16
2018-09-03 Perforation 4661.10 4661.40 16
2018-09-03 Perforation 4654.30 4654.60 16
2018-09-03 Multi-Stage Fracture 4654.30 4701.90 0
2018-09-04 Perforation 4647.60 4647.90 16
2018-08-29 Perforation 5291.70 5292.00 16
2018-09-04 Perforation 4640.00 4640.30 16
2018-09-04 Perforation 4634.00 4634.30 16
2018-09-04 Perforation 4627.30 4627.60 16
2018-09-04 Perforation 4620.30 4620.50 16
2018-09-04 Perforation 4613.80 4614.10 16
2018-09-04 Perforation 4607.00 4607.30 16
2018-09-04 Perforation 4600.20 4600.50 16
2018-09-04 Multi-Stage Fracture 4600.20 4647.90 0
2018-09-04 Perforation 4594.00 4594.30 16
2018-09-04 Perforation 4586.70 4587.00 16
2018-08-29 Perforation 5285.00 5285.30 16
2018-09-04 Perforation 4580.00 4580.30 16
2018-09-04 Perforation 4573.20 4573.50 16
2018-09-04 Perforation 4566.40 4566.70 16
2018-09-04 Perforation 4560.20 4560.50 16
2018-09-04 Perforation 4552.90 4553.20 16
2018-09-04 Perforation 4546.20 4546.50 16
2018-09-05 Multi-Stage Fracture 4546.20 4594.30 0
2018-09-05 Perforation 4539.40 4539.70 16
2018-09-05 Perforation 4532.60 4532.90 16
2018-09-05 Perforation 4525.90 4526.20 16
2018-08-29 Perforation 5278.40 5278.70 16
2018-09-05 Perforation 4519.10 4519.40 16
2018-09-05 Perforation 4512.40 4512.70 16
2018-09-05 Perforation 4505.60 4505.90 16
2018-09-05 Perforation 4498.80 4499.10 16
2018-09-05 Perforation 4492.10 4492.40 16
2018-09-05 Multi-Stage Fracture 4492.10 4539.70 0
2018-09-05 Perforation 4485.30 4485.60 16
2018-09-05 Perforation 4479.00 4479.30 16
2018-09-05 Perforation 4471.80 4472.10 16
2018-09-05 Perforation 4465.00 4465.30 16
2018-08-29 Perforation 5271.50 5271.80 16
2018-09-05 Perforation 4458.30 4458.60 16
2018-09-05 Perforation 4451.50 4451.80 16
2018-09-05 Perforation 4444.80 4445.10 16
2018-09-05 Perforation 4438.00 4438.30 16
2018-09-05 Multi-Stage Fracture 4438.00 4485.60 0
2018-09-05 Perforation 4430.50 4430.80 16
2018-09-05 Perforation 4424.50 4424.80 16
2018-09-05 Perforation 4417.70 4418.00 16
2018-09-05 Perforation 4411.00 4411.30 16
2018-09-05 Perforation 4404.20 4404.50 16
2018-08-29 Perforation 5264.80 5265.10 16
2018-09-05 Perforation 4397.40 4397.70 16
2018-09-05 Perforation 4390.70 4391.00 16
2018-09-05 Perforation 4383.90 4384.20 16
2018-09-06 Multi-Stage Fracture 4383.90 4430.80 0
2018-09-06 Perforation 4377.20 4377.50 16
2018-09-06 Perforation 4370.40 4370.70 16
2018-09-06 Perforation 4363.60 4363.90 16
2018-09-06 Perforation 4356.90 4357.20 16
2018-09-06 Perforation 4351.00 4351.30 16
2018-09-06 Perforation 4343.40 4343.70 16
2018-08-29 Perforation 5258.10 5258.40 16
2018-09-06 Perforation 4336.60 4336.90 16
2018-09-06 Perforation 4329.80 4330.10 16
2018-09-06 Multi-Stage Fracture 4329.80 4377.50 0
2018-09-07 Perforation 4323.10 4323.40 16
2018-09-07 Perforation 4316.50 4316.80 16
2018-09-07 Perforation 4309.60 4309.90 16
2018-09-07 Perforation 4302.80 4303.10 16
2018-09-07 Perforation 4296.00 4296.30 16
2018-09-07 Perforation 4289.30 4289.60 16
2018-09-07 Perforation 4282.50 4282.80 16
2018-08-29 Perforation 5251.40 5251.70 16
2018-09-07 Perforation 4275.80 4276.10 16
2018-09-07 Multi-Stage Fracture 4275.80 4323.40 0
2018-09-07 Perforation 4269.00 4269.30 16
2018-09-07 Perforation 4262.20 4262.50 16
2018-09-07 Perforation 4255.50 4255.80 16
2018-09-07 Perforation 4248.70 4249.00 16
2018-09-07 Perforation 4242.00 4242.30 16
2018-09-07 Perforation 4235.20 4235.50 16
2018-09-07 Perforation 4228.40 4228.70 16
2018-09-07 Perforation 4221.50 4221.80 16
2018-08-29 Multi-Stage Fracture 5251.40 5299.00 0
2018-09-08 Multi-Stage Fracture 4221.50 4269.30 0
2018-09-08 Perforation 4214.90 4215.20 16
2018-09-08 Perforation 4208.20 4208.50 16
2018-09-08 Perforation 4201.40 4201.70 16
2018-09-08 Perforation 4194.40 4194.70 16
2018-09-08 Perforation 4187.90 4188.20 16
2018-09-08 Perforation 4181.10 4181.40 16
2018-09-08 Perforation 4174.40 4174.70 16
2018-09-08 Perforation 4167.70 4167.90 16
2018-09-08 Multi-Stage Fracture 4167.70 4215.20 0
2018-08-29 Perforation 5188.30 5188.60 16
2018-09-08 Perforation 4161.00 4161.30 16
2018-09-08 Perforation 4154.10 4154.40 16
2018-09-08 Perforation 4147.30 4147.60 16
2018-09-08 Perforation 4140.60 4140.90 16
2018-09-08 Perforation 4133.80 4134.10 16
2018-09-08 Perforation 4127.00 4127.30 16
2018-09-08 Perforation 4120.30 4120.60 16
2018-09-08 Perforation 4112.80 4113.10 16
2018-09-09 Multi-Stage Fracture 4112.80 4161.30 0
2018-09-09 Perforation 4106.80 4107.10 16
2018-07-22 Perforation 5506.00 5506.30 16
2018-08-29 Perforation 5181.60 5181.90 16
2018-09-09 Perforation 4100.00 4100.30 16
2018-09-09 Perforation 4093.20 4093.50 16
2018-09-09 Perforation 4086.50 4086.80 16
2018-09-09 Perforation 4079.70 4080.00 16
2018-09-09 Perforation 4073.00 4073.30 16
2018-09-09 Perforation 4066.20 4066.50 16
2018-09-09 Perforation 4059.50 4059.80 16
2018-09-09 Multi-Stage Fracture 4059.50 4107.10 0
2018-09-10 Perforation 4052.70 4053.00 16
2018-09-10 Perforation 4045.90 4046.20 16
2018-08-29 Perforation 5174.80 5175.10 16
2018-09-10 Perforation 4039.20 4039.50 16
2018-09-10 Perforation 4031.50 4031.80 16
2018-09-10 Perforation 4025.70 4026.00 16
2018-09-10 Perforation 4018.90 4019.20 16
2018-09-10 Perforation 4012.10 4012.40 16
2018-09-10 Perforation 4005.40 4005.70 16
2018-09-10 Multi-Stage Fracture 4005.40 4053.00 0
2018-09-10 Perforation 3998.60 3998.90 16
2018-09-10 Perforation 3991.90 3992.20 16
2018-09-10 Perforation 3985.10 3985.40 16
2018-08-29 Perforation 5169.00 5169.30 16
2018-09-10 Perforation 3978.30 3978.60 16
2018-09-10 Perforation 3971.60 3971.90 16
2018-09-10 Perforation 3964.80 3965.10 16
2018-09-10 Perforation 3958.10 3958.40 16
2018-09-10 Perforation 3951.30 3951.60 16
2018-09-10 Multi-Stage Fracture 3951.30 3998.90 0
2018-09-11 Perforation 3944.50 3944.80 16
2018-09-11 Perforation 3937.80 3938.10 16
2018-09-11 Perforation 3931.00 3931.30 16
2018-09-11 Perforation 3924.30 3924.60 16
2018-08-29 Perforation 5161.30 5161.60 16
2018-09-11 Perforation 3917.50 3917.80 16
2018-09-11 Perforation 3910.70 3911.00 16
2018-09-11 Perforation 3904.00 3904.30 16
2018-09-11 Perforation 3897.20 3897.50 16
2018-09-11 Multi-Stage Fracture 3897.20 3944.80 0
2018-09-11 Perforation 3890.50 3890.80 16
2018-09-11 Perforation 3883.70 3884.00 16
2018-09-11 Perforation 3876.90 3877.20 16
2018-09-11 Perforation 3869.80 3870.10 16
2018-09-11 Perforation 3863.40 3863.70 16
2018-08-29 Perforation 5154.50 5154.80 16
2018-09-11 Perforation 3856.70 3857.00 16
2018-09-11 Perforation 3849.90 3850.20 16
2018-09-11 Perforation 3843.10 3843.40 16
2018-09-13 Multi-Stage Fracture 3843.10 3890.80 0
2018-09-13 Perforation 3836.80 3837.10 16
2018-09-13 Perforation 3829.60 3829.90 16
2018-09-13 Perforation 3822.90 3823.20 16
2018-09-13 Perforation 3816.10 3816.40 16
2018-09-13 Perforation 3809.30 3809.60 16
2018-09-13 Perforation 3802.60 3802.90 16
2018-08-29 Perforation 5147.80 5148.10 16
2018-09-13 Perforation 3795.80 3796.10 16
2018-09-13 Perforation 3789.10 3789.40 16
2018-09-14 Multi-Stage Fracture 3789.10 3837.10 0
2018-09-14 Perforation 3782.30 3782.60 16
2018-09-14 Perforation 3775.50 3775.80 16
2018-09-14 Perforation 3768.80 3769.10 16
2018-09-14 Perforation 3762.00 3762.30 16
2018-09-14 Perforation 3755.50 3755.80 16
2018-09-14 Perforation 3748.50 3748.80 16
2018-09-14 Perforation 3741.70 3742.00 16
2018-08-29 Perforation 5141.00 5141.30 16
2018-09-14 Perforation 3735.00 3735.30 16
2018-09-14 Multi-Stage Fracture 3735.00 3782.60 0
2018-09-14 Perforation 3728.20 3728.50 16
2018-09-14 Perforation 3721.50 3721.80 16
2018-09-14 Perforation 3714.70 3715.00 16
2018-09-14 Perforation 3707.00 3707.30 16
2018-09-14 Perforation 3701.20 3701.50 16
2018-09-14 Perforation 3694.40 3694.70 16
2018-09-14 Perforation 3687.70 3688.00 16
2018-09-14 Perforation 3680.90 3681.20 16
2018-08-29 Multi-Stage Fracture 5141.00 5188.60 0
2018-09-15 Multi-Stage Fracture 3680.90 3728.50 0
2018-09-15 Perforation 3674.10 3674.40 16
2018-09-15 Perforation 3667.40 3667.70 16
2018-09-15 Perforation 3660.60 3660.90 16
2018-09-15 Perforation 3653.90 3654.20 16
2018-09-15 Perforation 3647.10 3647.40 16
2018-09-15 Perforation 3640.30 3640.60 16
2018-09-15 Perforation 3633.60 3633.90 16
2018-09-15 Perforation 3627.60 3627.90 16
2018-09-15 Multi-Stage Fracture 3627.60 3674.40 0
2018-08-30 Perforation 5134.30 5134.60 16
2018-09-15 Perforation 3620.10 3620.40 16
2018-09-15 Perforation 3613.30 3613.60 16
2018-09-15 Perforation 3606.50 3606.80 16
2018-09-15 Perforation 3599.80 3600.10 16
2018-09-15 Perforation 3593.00 3593.30 16
2018-09-15 Perforation 3586.30 3586.60 16
2018-09-15 Perforation 3579.50 3579.80 16
2018-09-15 Perforation 3572.70 3573.00 16
2018-09-16 Multi-Stage Fracture 3572.70 3620.40 0
2018-09-16 Perforation 3566.00 3566.30 16
2018-08-30 Perforation 5127.50 5127.80 16
2018-09-16 Perforation 3559.20 3559.50 16
2018-09-16 Perforation 3552.50 3552.80 16
2018-09-16 Perforation 3546.00 3546.30 16
2018-09-16 Perforation 3538.90 3539.20 16
2018-09-16 Perforation 3532.20 3532.50 16
2018-09-16 Perforation 3525.40 3525.70 16
2018-09-16 Perforation 3519.50 3519.80 16
2018-09-16 Multi-Stage Fracture 3519.50 3566.30 0
2018-09-16 Perforation 3511.90 3512.20 16
2018-09-16 Perforation 3505.10 3505.40 16
2018-07-22 Perforation 5499.20 5499.50 16
2018-08-30 Perforation 5120.00 5120.30 16
2018-09-16 Perforation 3498.40 3498.70 16
2018-09-16 Perforation 3491.60 3491.90 16
2018-09-16 Perforation 3484.90 3485.20 16
2018-09-16 Perforation 3478.10 3478.40 16
2018-09-16 Perforation 3471.00 3471.30 16
2018-09-16 Perforation 3464.60 3464.90 16
2018-09-17 Multi-Stage Fracture 3464.60 3512.20 0
2018-09-17 Perforation 3457.80 3458.10 16
2018-09-17 Perforation 3451.10 3451.40 16
2018-09-17 Perforation 3444.30 3444.60 16
2018-08-30 Perforation 5114.00 5114.30 16
2018-09-17 Perforation 3438.00 3438.30 16
2018-09-17 Perforation 3430.80 3431.10 16
2018-09-17 Perforation 3424.00 3424.30 16
2018-09-17 Perforation 3417.30 3417.60 16
2018-09-18 Multi-Stage Fracture 3417.30 3464.90 0
2018-09-18 Perforation 3410.50 3410.80 16
2018-09-18 Perforation 3403.70 3404.00 16
2018-09-18 Perforation 3397.00 3397.30 16
2018-09-18 Perforation 3389.50 3389.80 16
2018-09-18 Perforation 3383.50 3383.80 16
2018-08-30 Perforation 5107.20 5107.50 16
2018-09-18 Perforation 3376.70 3377.00 16
2018-09-18 Perforation 3369.90 3370.20 16
2018-09-18 Perforation 3363.20 3363.50 16
2018-09-18 Perforation 3357.50 3357.80 16
2018-09-18 Multi-Stage Fracture 3357.50 3404.00 0
2018-09-18 Perforation 3349.70 3350.00 16
2018-09-18 Perforation 3342.90 3343.20 16
2018-09-18 Perforation 3336.10 3336.40 16
2018-09-18 Perforation 3329.40 3329.70 16
2018-09-18 Perforation 3322.60 3322.90 16
2018-08-30 Perforation 5100.50 5100.80 16
2018-09-18 Perforation 3315.90 3316.20 16
2018-09-18 Perforation 3308.50 3308.80 16
2018-09-18 Perforation 3302.30 3302.60 16
2018-09-19 Multi-Stage Fracture 3302.30 3350.00 0
2018-09-19 Perforation 3295.60 3295.90 16
2018-09-19 Perforation 3288.80 3289.10 16
2018-09-19 Perforation 3282.10 3282.40 16
2018-09-19 Perforation 3275.50 3275.80 16
2018-09-19 Perforation 3268.50 3268.80 16
2018-09-19 Perforation 3261.80 3262.10 16
2018-08-30 Perforation 5093.70 5094.00 16
2018-09-19 Perforation 3255.00 3255.30 16
2018-09-19 Perforation 3248.30 3248.60 16
2018-09-20 Multi-Stage Fracture 3248.30 3295.90 0
2018-09-20 Perforation 3241.50 3241.80 16
2018-09-20 Perforation 3234.70 3235.00 16
2018-09-20 Perforation 3229.00 3229.30 16
2018-09-20 Perforation 3221.20 3221.50 16
2018-09-20 Perforation 3214.50 3214.80 16
2018-09-20 Perforation 3207.70 3208.00 16
2018-09-20 Perforation 3200.90 3201.20 16
2018-08-30 Perforation 5087.20 5087.50 16
2018-09-20 Perforation 3194.50 3194.80 16
2018-09-20 Multi-Stage Fracture 3194.50 3241.80 0
2018-09-20 Perforation 3187.40 3187.70 16
2018-09-20 Perforation 3180.70 3181.00 16
2018-09-20 Perforation 3173.90 3174.20 16
2018-09-20 Perforation 3167.10 3167.40 16
2018-09-20 Perforation 3160.40 3160.70 16
2018-09-20 Perforation 3153.60 3153.90 16
2018-09-20 Perforation 3146.00 3146.30 16
2018-09-20 Perforation 3140.10 3140.40 16
2018-08-30 Multi-Stage Fracture 5087.20 5134.60 0
2018-09-21 Multi-Stage Fracture 3140.10 3187.70 0
2018-09-21 Perforation 3133.30 3133.60 16
2018-09-21 Perforation 3126.60 3126.90 16
2018-09-21 Perforation 3119.80 3120.10 16
2018-09-21 Perforation 3113.10 3113.40 16
2018-09-21 Perforation 3106.30 3106.60 16
2018-09-21 Perforation 3099.60 3099.90 16
2018-09-21 Perforation 3092.80 3093.10 16
2018-09-21 Perforation 3086.00 3086.30 16
2018-09-21 Multi-Stage Fracture 3086.00 3133.60 0
2018-08-30 Perforation 5080.20 5080.50 16
2018-09-21 Perforation 3079.30 3079.60 16
2018-09-21 Perforation 3072.50 3072.80 16
2018-09-21 Perforation 3065.80 3066.10 16
2018-09-21 Perforation 3059.00 3059.30 16
2018-09-21 Perforation 3052.20 3052.50 16
2018-09-21 Perforation 3045.50 3045.80 16
2018-09-21 Perforation 3038.70 3039.00 16
2018-09-21 Perforation 3032.50 3032.80 16
2018-09-22 Multi-Stage Fracture 3032.50 3079.60 0
2018-09-22 Perforation 3025.20 3025.50 16
2018-08-30 Perforation 5073.40 5073.70 16
2018-09-22 Perforation 3018.40 3018.70 16
2018-09-22 Perforation 3011.70 3012.00 16
2018-09-22 Perforation 3004.90 3005.20 16
2018-09-22 Perforation 2998.50 2998.80 16
2018-09-22 Perforation 2991.40 2991.70 16
2018-09-22 Perforation 2984.60 2984.90 16
2018-09-22 Perforation 2977.70 2978.00 16
2018-09-22 Multi-Stage Fracture 2977.70 3025.50 0
2018-09-22 Perforation 2971.10 2971.40 16
2018-09-22 Perforation 2964.40 2964.70 16
2018-08-30 Perforation 5066.70 5067.00 16
2018-09-22 Perforation 2957.60 2957.90 16
2018-09-22 Perforation 2950.00 2950.30 16
2018-09-22 Perforation 2944.10 2944.40 16
2018-09-22 Perforation 2937.30 2937.60 16
2018-09-22 Perforation 2930.60 2930.90 16
2018-09-22 Perforation 2923.80 2924.10 16
2018-09-23 Multi-Stage Fracture 2923.80 2971.40 0
2018-09-23 Perforation 2917.00 2917.30 16
2018-09-23 Perforation 2910.30 2910.60 16
2018-09-23 Perforation 2903.50 2903.80 16
2018-07-22 Perforation 5492.40 5492.70 16
2018-08-30 Perforation 5059.90 5060.20 16
2018-09-23 Perforation 2896.80 2897.10 16
2018-09-23 Perforation 2890.00 2890.30 16
2018-09-23 Perforation 2883.20 2883.50 16
2018-09-23 Perforation 2876.50 2876.80 16
2018-09-23 Perforation 2869.30 2869.60 16
2018-09-23 Multi-Stage Fracture 2869.30 2917.30 0
2018-09-23 Perforation 2863.00 2863.30 16
2018-09-23 Perforation 2856.20 2856.50 16
2018-09-23 Perforation 2849.40 2849.70 16
2018-09-23 Perforation 2842.70 2843.00 16
2018-08-30 Perforation 5053.10 5053.40 16
2018-09-23 Perforation 2835.90 2836.20 16
2018-09-23 Perforation 2829.20 2829.50 16
2018-09-23 Perforation 2822.40 2822.70 16
2018-09-23 Perforation 2815.60 2815.90 16
2018-09-24 Multi-Stage Fracture 2815.60 2863.30 0
2018-09-24 Perforation 2808.90 2809.20 16
2018-09-24 Perforation 2802.10 2802.40 16
2018-09-24 Perforation 2795.40 2795.70 16
2018-09-24 Perforation 2788.60 2788.90 16
2018-09-24 Perforation 2781.80 2782.10 16
2018-08-30 Perforation 5046.40 5046.70 16
2018-09-24 Perforation 2775.10 2775.40 16
2018-09-24 Perforation 2768.30 2768.60 16
2018-09-24 Perforation 2761.60 2761.90 16
2018-09-24 Multi-Stage Fracture 2761.60 2809.20 0
2018-08-30 Perforation 5039.00 5039.30 16
2018-08-30 Perforation 5032.90 5033.20 16
2018-08-31 Multi-Stage Fracture 5032.90 5080.50 0
2018-08-31 Perforation 5026.10 5026.40 16
2018-08-31 Perforation 5019.40 5019.70 16
2018-08-31 Perforation 5012.60 5012.90 16
2018-08-31 Perforation 5005.80 5006.10 16
2018-07-22 Perforation 5485.60 5485.90 16
2018-08-31 Perforation 4999.10 4999.40 16
2018-08-31 Perforation 4992.30 4992.60 16
2018-08-31 Perforation 4985.60 4985.90 16
2018-08-31 Perforation 4978.80 4979.10 16
2018-09-01 Multi-Stage Fracture 4978.80 5026.40 0
2018-09-01 Perforation 4972.00 4972.30 16
2018-09-01 Perforation 4965.30 4965.60 16
2018-09-01 Perforation 4959.10 4959.40 16
2018-09-01 Perforation 4951.80 4952.10 16
2018-09-01 Perforation 4945.00 4945.30 16
2018-07-22 Perforation 5478.80 5479.10 16
2018-09-01 Perforation 4938.20 4938.50 16
2018-09-01 Perforation 4931.50 4931.80 16
2018-09-01 Perforation 4924.70 4925.00 16
2018-09-01 Multi-Stage Fracture 4924.70 4972.30 0
2018-09-01 Perforation 4918.00 4918.30 16
2018-09-01 Perforation 4911.00 4911.30 16
2018-09-01 Perforation 4904.40 4904.70 16
2018-09-01 Perforation 4897.70 4898.00 16
2018-09-01 Perforation 4890.90 4891.20 16
2018-09-01 Perforation 4884.20 4884.50 16
2018-07-22 Perforation 5472.00 5472.30 16
2018-09-01 Perforation 4878.10 4878.40 16
2018-09-01 Perforation 4870.60 4870.90 16
2018-09-02 Multi-Stage Fracture 4870.60 4918.30 0
2018-09-02 Perforation 4863.90 4864.20 16
2018-09-02 Perforation 4857.10 4857.40 16
2018-09-02 Perforation 4850.50 4850.80 16
2018-09-02 Perforation 4843.60 4843.90 16
2018-09-02 Perforation 4836.80 4837.10 16
2018-09-02 Perforation 4830.10 4830.40 16
2018-09-02 Perforation 4823.30 4823.60 16
2018-07-22 Perforation 5465.20 5465.50 16
2018-09-02 Perforation 4816.60 4816.90 16
2018-09-02 Multi-Stage Fracture 4816.60 4864.20 0
2018-09-02 Perforation 4809.80 4810.10 16
2018-09-02 Perforation 4804.00 4804.30 16
2018-09-02 Perforation 4796.30 4796.60 16
2018-09-02 Perforation 4789.50 4789.80 16
2018-09-02 Perforation 4782.80 4783.10 16
2018-09-02 Perforation 4776.00 4776.30 16
2018-09-02 Perforation 4769.20 4769.50 16
2018-09-02 Perforation 4762.50 4762.80 16
2018-08-28 Multi-Stage Fracture 5465.20 5513.10 0
2018-09-03 Multi-Stage Fracture 4762.50 4810.10 0
2018-09-03 Perforation 4755.70 4756.00 16
2018-09-03 Perforation 4749.00 4749.30 16
2018-09-03 Perforation 4742.20 4742.50 16
2018-09-03 Perforation 4735.40 4735.70 16
2018-09-03 Perforation 4728.70 4729.00 16
2018-09-03 Perforation 4722.50 4722.80 16
2018-09-03 Perforation 4715.20 4715.50 16
2018-09-03 Perforation 4708.40 4708.70 16
2018-09-03 Multi-Stage Fracture 4708.40 4756.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-28 2018-09-24 2,575 60,102 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.7272 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 5.7367 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.4151 N/A
Water 7732-18-5 100 0.4151 N/A
X-CIDE 450 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0308 N/A
Methanol 67-56-1 100 0.0308 N/A
Water 7732-18-5 100 0.0308 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0015 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0006 N/A
Methanol 67-56-1 100 0.0006 N/A
Modified thiourea polymer 68527-49-1 100 0.0006 N/A
Olefin 64743-02-8 100 0.0006 N/A
Polyoxyalkylenes 68951-67-7 100 0.0006 N/A
Propargyl alcohol 107-19-7 100 0.0006 N/A
XFRAC-01 BJ Services Friction Reducer Alcohols. C10-16. ethoxylated 68002-97-1 100 0.0691 N/A
Petroleum Distillates. Hydrotreated light naphthenic 64742-53-6 100 0.0691 N/A
Polyacrylamide 5/8/9003 100 0.0691 N/A
InFlo 73 BJ Services Surfactant Alkoxylated alcohol_2 9969 100 0.009 N/A
Amine derivative 9969 100 0.009 N/A
Cyclohexanol 108-93-0 100 0.009 N/A
Glycerine 56-81-5 100 0.009 N/A
Pentanol 71-41-0 100 0.009 N/A
Petroleum distillates 64742-47-8 100 0.009 N/A
Propylene glycol 57-55-6 100 0.009 N/A
Urea 57-13-6 100 0.009 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-31 2018-09-16 Oilfield Produced Water 153
2018-08-28 2018-09-20 Oilfield Produced Water 2150
2018-09-11 2018-09-11 Oilfield Produced Water 8
2018-08-28 2018-09-20 Oilfield Produced Water 695
2018-08-28 2018-09-19 Oilfield Produced Water 226
2018-08-28 2018-09-24 Surface Water - Runoff 52642

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1217 0.0 0.0 0.0
2019 8059 0.0 0.0 0.0
2020 2058 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-18 No Incident Encountered 0.00 0.00
2018-09-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References