If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385010304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.235783,"lon":-114.048329,"icon":""}]} |
| Location: 00/04-03-038-01W5/0 | |
| Location Alias: 00/04-03-38-01 W5M | |
| Location Alias 2: 00/04-03-038-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 03 | |
| County/Municipality: Red Deer County | |
| Well Name: NPOG SYLAKE 4-3-38-1 | |
| Operator Name: Vesta Energy Ltd. | |
| License Number: 0433458 | |
| License Date: 2011-05-11 | |
| License Status: Suspension | |
| Spud Date: 2011-06-14 | |
| Final Drill Date: 2011-06-30 | |
| Well Total Depth: 3150.00 m | |
| Surface Hole Latitude: 52.235783 | |
| Surface Hole Longitude: -114.048329 |
| Date | Event |
|---|---|
| 2011-05-11 | Obtained License |
| 2011-06-15 | Surface Casing Operation Performed |
| 2011-06-19 | Direction Drilling Operation Performed - Horizontal |
| 2011-06-23 | Intermediate Casing Operation Performed |
| 2011-06-30 | Finished Drilling |
| 2011-06-30 | Well Mode changed to Drilled and Cased |
| 2011-07-01 | Liner Casing Operation Performed |
| 2011-07-03 | Rig Released |
| 2011-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-22 | Perforation Treatment Performed - Remedial Casing |
| 2011-10-01 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-04 | Perforation Treatment Performed - Remedial Casing |
| 2011-10-15 | Perforation Treatment Performed - Remedial Casing |
| 2011-11-11 | Well Began Production |
| 2011-11-11 | Well Fluid changed to Crude Oil |
| 2011-11-11 | Well Mode changed to Pumping |
| 2013-03-17 | Well Fluid changed to Crude Oil |
| 2013-03-17 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-06-19 | 1472.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-07-25 | Open Hole/Barefoot Completion | 2032.00 | 3150.00 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2607.70 | 2607.80 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2692.30 | 2692.40 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2060.00 | 2060.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2156.40 | 2156.50 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2229.90 | 2230.00 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2302.50 | 2302.60 | 0 |
| 2011-09-21 | Perforation | 480.00 | 481.00 | 17 |
| 2011-09-22 | Remedial Casing Cementing | 480.00 | 481.00 | 0 |
| 2011-10-01 | Perforation | 391.50 | 392.50 | 17 |
| 2011-10-01 | Perforation | 208.00 | 212.00 | 17 |
| 2011-07-25 | Multi-Stage Fracture | 2839.40 | 2839.50 | 0 |
| 2011-10-04 | Remedial Casing Cementing | 208.00 | 212.00 | 0 |
| 2011-10-15 | Remedial Casing Cementing | 391.50 | 392.50 | 0 |
| 2011-07-25 | Multi-Stage Fracture | 2924.20 | 2924.30 | 0 |
| 2011-07-25 | Multi-Stage Fracture | 2985.90 | 2986.00 | 0 |
| 2011-07-25 | Multi-Stage Fracture | 3070.60 | 3070.70 | 0 |
| 2011-07-25 | Multi-Stage Fracture | 2766.00 | 2766.10 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2376.50 | 2376.60 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2449.70 | 2449.80 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2545.90 | 2546.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 623 | 0.0 | 0.0 | 0.0 |
| 2012 | 5637 | 0.0 | 0.0 | 0.0 |
| 2013 | 959 | 0.0 | 0.0 | 0.0 |
For data sources see[6]