X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385021507004

Well Details

Well ID: 0385021507004
Loading map...
Location: 00/07-15-038-02W5/4
Location Alias: 00/07-15-38-02 W5M
Location Alias 2: 00/07-15-038-02 W5/04
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 15
County/Municipality: Red Deer County
Well Name: RENAISSANCE CPR SYLAKE 7-15MU-38-2
Operator Name: Husky Oil Operations Limited
License Number: 0023362
License Date: 1962-11-20
License Status: Issued
Spud Date: 1962-11-22
Final Drill Date: 1962-12-23
Well Total Depth: 2275.30 m
Surface Hole Latitude: 52.266445
Surface Hole Longitude: -114.201141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-20 Obtained License
1962-12-03 Drill Stem Test Performed
1962-12-12 Drill Stem Test Performed
1962-12-13 Drill Stem Test Performed
1962-12-14 Drill Stem Test Performed
1962-12-15 Drill Stem Test Performed
1962-12-16 Drill Stem Test Performed
1962-12-19 Drill Stem Test Performed
1962-12-21 Drill Stem Test Performed
1962-12-23 Finished Drilling
1962-12-23 Well Mode changed to Drilled and Cased
1962-12-24 Drill Stem Test Performed
1962-12-25 Production Casing Operation Performed
1963-01-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-21 Perforation Treatment Performed - Fractured
1964-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-04-22 Perforation Treatment Performed - Jet Perforation
1964-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-24 Perforation Treatment Performed - Fractured
1964-09-01 Perforation Treatment Performed - Selective Bullet Perforations
1969-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-20 Perforation Treatment Performed - Jet Perforation
1969-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-05-17 Perforation Treatment Performed - Jet Perforation
1971-05-19 Perforation Treatment Performed - Jet Perforation
1971-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-05-26 Perforation Treatment Performed - Fractured
1971-06-02 Well Began Production
1971-06-02 Well Fluid changed to Crude Oil
1971-06-02 Well Mode changed to Flowing
1974-01-01 Well Fluid changed to Crude Oil
1974-01-01 Well Mode changed to Suspended
1976-07-27 Well Fluid changed to Crude Oil
1976-07-27 Well Mode changed to Flowing
1977-10-01 Well Fluid changed to Crude Oil
1977-10-01 Well Mode changed to Suspended
1992-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-07 Well Fluid changed to Crude Oil
1992-11-07 Well Mode changed to Flowing
1993-03-04 Well Fluid changed to Crude Oil
1993-03-04 Well Mode changed to Suspended
1993-03-07 Well Log Performed
1993-03-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-19 Hydra Jet Perforation 2194.90 2194.90 3
1964-09-01 Selective Bullet Perforations 2117.80 2119.90 0
1964-09-01 Selective Bullet Perforations 2124.20 2124.80 0
1964-09-01 Selective Bullet Perforations 2128.10 2129.00 0
1969-10-16 Acid Treatment 2115.90 2129.00 0
1969-10-16 Acid Treatment 2115.90 2129.00 0
1969-10-20 Perforation 2073.20 2083.60 7
1969-10-21 Acid Treatment 2073.20 2083.60 0
1970-01-27 Acid Treatment 2073.20 2083.60 0
1971-05-17 Packing Device Capped w/Cement 2182.40 2182.40 0
1971-05-17 Perforation 2172.60 2176.30 13
1963-01-19 Acid Treatment 2194.90 2194.90 0
1971-05-19 Perforation 2176.30 2177.20 13
1971-05-20 Acid Treatment 2073.20 2083.60 0
1971-05-26 Fracture 2073.20 2083.60 0
1992-09-11 Acid Treatment 2073.20 2083.60 0
1993-03-13 Perforation 2115.90 2118.40 13
1963-01-21 Fracture 2194.90 2194.90 0
1964-04-22 Packing Device Capped w/Cement 2193.30 2193.30 0
1964-04-22 Perforation 2185.70 2186.90 7
1964-04-22 Perforation 2190.00 2191.50 7
1964-04-23 Acid Treatment 2185.70 2191.50 0
1964-04-24 Fracture 2185.70 2191.50 0
1964-09-01 Selective Bullet Perforations 2115.90 2116.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 749 0.0 0.0 0.0
1972 2 0.0 0.0 0.0
1976 109 0.0 0.0 0.0
1992 1296 0.0 0.0 0.0
1993 1415 0.0 0.0 0.0

For data sources see[5]

References