Well Details

Well ID: 0385021605000
Loading map...
Location: 00/05-16-038-02W5/0
Location Alias: 00/05-16-38-02 W5M
Location Alias 2: 00/05-16-038-02 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 02
Section: 16
County/Municipality: Red Deer County
Well Name: RENAISSANCE CALST SYLAKE 5-16MU-38-2
Operator Name: Husky Oil Operations Limited
License Number: 0005763
License Date: 1952-12-03
License Status: Issued
Spud Date: 1952-12-08
Final Drill Date: 1953-04-25
Well Total Depth: 2895.00 m
Surface Hole Latitude: 52.266427
Surface Hole Longitude: -114.237116

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-03 Obtained License
1953-01-22 Drill Stem Test Performed
1953-02-01 Drill Stem Test Performed
1953-02-04 Drill Stem Test Performed
1953-02-09 Drill Stem Test Performed
1953-03-23 Drill Stem Test Performed
1953-03-25 Drill Stem Test Performed
1953-03-26 Drill Stem Test Performed
1953-04-25 Finished Drilling
1953-04-30 Production Casing Operation Performed
1953-05-05 Perforation Treatment Performed - Bullet Perforation
1953-05-06 Drill Stem Test Performed
1953-05-06 Perforation Treatment Performed - Bullet Perforation
1953-05-07 Drill Stem Test Performed
1953-05-07 Perforation Treatment Performed - Cement Squeeze
1953-05-08 Drill Stem Test Performed
1954-01-27 Well Mode changed to Drilled and Cased
1964-01-29 Perforation Treatment Performed - Selective Bullet Perforations
1964-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-07 Perforation Treatment Performed - Cement Squeeze
1964-02-19 Well Mode changed to Drilled and Cased
1964-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-04-03 Plug Back Performed
1964-04-10 Drill Stem Test Performed
1964-04-14 Perforation Treatment Performed - Selective Jet Perforations
1964-04-16 Drill Stem Test Performed
1964-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-27 Well Began Production
1964-12-27 Well Fluid changed to Gas
1964-12-27 Well Mode changed to Flowing
1970-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-01 Well Fluid changed to Gas
1970-04-01 Well Mode changed to Suspended
1970-09-18 Well Fluid changed to Gas
1970-09-18 Well Mode changed to Flowing
1975-08-27 Well Fluid changed to Gas
1975-08-27 Well Mode changed to Suspended
1996-03-11 Well Fluid changed to Crude Oil
1996-03-11 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-05 Bullet Perforation 2415.50 2417.40 13
1964-01-29 Selective Bullet Perforations 2144.30 2145.20 0
1964-01-29 Selective Bullet Perforations 2146.10 2147.00 0
1964-01-29 Selective Bullet Perforations 2147.90 2147.90 0
1964-01-29 Selective Bullet Perforations 2128.40 2129.00 0
1964-01-29 Selective Bullet Perforations 2129.60 2130.20 0
1964-01-29 Selective Bullet Perforations 2130.90 2131.50 0
1964-01-29 Selective Bullet Perforations 2132.10 2132.70 0
1964-01-29 Selective Bullet Perforations 2133.30 2133.90 0
1964-01-29 Selective Bullet Perforations 2134.50 2135.10 0
1964-01-29 Selective Bullet Perforations 2135.70 2136.80 0
1953-05-06 Bullet Perforation 2063.50 2065.00 13
1964-01-29 Selective Bullet Perforations 2137.00 2137.60 0
1964-01-29 Selective Bullet Perforations 2138.20 2138.80 0
1964-01-29 Selective Bullet Perforations 2091.20 2091.80 0
1964-01-29 Selective Bullet Perforations 2092.50 2093.10 0
1964-01-29 Selective Bullet Perforations 2093.70 2094.30 0
1964-01-29 Selective Bullet Perforations 2094.90 2095.50 0
1964-01-29 Selective Bullet Perforations 2096.10 2096.70 0
1964-01-29 Selective Bullet Perforations 2097.30 2097.90 0
1964-01-29 Selective Bullet Perforations 2098.50 2099.20 0
1964-01-29 Selective Bullet Perforations 2099.80 2100.10 0
1953-05-07 Cement Squeeze 2063.50 2065.00 0
1964-01-29 Selective Bullet Perforations 2057.40 2058.30 0
1964-01-29 Selective Bullet Perforations 2059.20 2060.10 0
1964-01-29 Selective Bullet Perforations 2061.10 2062.00 0
1964-01-29 Selective Bullet Perforations 2062.90 2063.80 0
1964-01-29 Selective Bullet Perforations 2064.70 2065.00 0
1964-02-01 Acid Treatment 2128.40 2150.70 0
1964-02-05 Acid Treatment 2091.20 2100.10 0
1964-02-07 Acid Treatment 2057.40 2065.00 0
1964-02-07 Cement Squeeze 2057.40 2100.10 0
1964-04-03 Packing Device Capped w/Cement 2194.60 2407.90 0
1964-01-29 Selective Bullet Perforations 2147.90 2148.50 0
1964-04-14 Selective Jet Perforations 2091.50 2092.10 0
1964-04-14 Selective Jet Perforations 2092.80 2093.40 0
1964-04-14 Selective Jet Perforations 2094.00 2094.60 0
1964-04-14 Selective Jet Perforations 2095.20 2095.80 0
1964-04-14 Selective Jet Perforations 2096.40 2097.00 0
1964-04-14 Selective Jet Perforations 2097.60 2097.60 0
1964-04-14 Selective Jet Perforations 2057.70 2058.30 0
1964-04-14 Selective Jet Perforations 2058.90 2059.50 0
1964-04-14 Selective Jet Perforations 2061.10 2061.80 0
1964-04-14 Selective Jet Perforations 2061.40 2062.00 0
1964-01-29 Selective Bullet Perforations 2149.10 2149.80 0
1964-04-14 Selective Jet Perforations 2062.60 2063.20 0
1964-04-14 Selective Jet Perforations 2063.80 2063.80 0
1964-04-26 Acid Treatment 2057.70 2063.80 0
1964-04-26 Acid Treatment 2128.40 2150.70 0
1970-02-07 Acid Treatment 2091.20 2100.10 0
1964-01-29 Selective Bullet Perforations 2150.40 2150.70 0
1964-01-29 Selective Bullet Perforations 2138.80 2139.70 0
1964-01-29 Selective Bullet Perforations 2140.60 2141.50 0
1964-01-29 Selective Bullet Perforations 2142.40 2143.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 900 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1975 228 0.0 0.0 0.0
1996 5123 0.0 0.0 0.0
1997 1661 0.0 0.0 0.0

For data sources see[5]