If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385022015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.28897,"lon":-114.248725,"icon":""}]} |
| Location: 00/15-20-038-02W5/0 | |
| Location Alias: 00/15-20-38-02 W5M | |
| Location Alias 2: 00/15-20-038-02 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 20 | |
| County/Municipality: Red Deer County | |
| Well Name: HARVEST SYLAKE 15-20-38-2 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0292496 | |
| License Date: 2003-09-08 | |
| License Status: Suspension | |
| Spud Date: 2003-09-27 | |
| Final Drill Date: 2003-10-09 | |
| Well Total Depth: 2187.00 m | |
| Surface Hole Latitude: 52.288970 | |
| Surface Hole Longitude: -114.248725 |
| Date | Event |
|---|---|
| 2003-09-08 | Obtained License |
| 2003-09-28 | Surface Casing Operation Performed |
| 2003-10-09 | Finished Drilling |
| 2003-10-09 | Production Casing Operation Performed |
| 2003-10-09 | Well Log Performed |
| 2003-10-09 | Well Mode changed to Drilled and Cased |
| 2003-10-11 | Rig Released |
| 2003-10-30 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-30 | Well Log Performed |
| 2003-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-11-12 | Well Began Production |
| 2003-11-12 | Well Fluid changed to Crude Oil |
| 2003-11-12 | Well Mode changed to Pumping |
| 2003-12-11 | Well Log Performed |
| 2006-11-01 | Well Began Injection |
| 2006-11-01 | Well Fluid changed to Water |
| 2006-11-01 | Well Type changed to Injection |
| 2016-12-01 | Well Fluid changed to Water |
| 2016-12-01 | Well Mode changed to Suspended |
| 2016-12-01 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-10-30 | Perforation | 2148.00 | 2157.00 | 14 |
| 2003-10-30 | Perforation | 2142.00 | 2148.00 | 14 |
| 2003-11-10 | Acid Treatment | 2142.00 | 2157.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 1072 | 0.0 | 0.0 | 0.0 |
| 2004 | 5060 | 0.0 | 0.0 | 0.0 |
| 2005 | 259 | 0.0 | 0.0 | 0.0 |
| 2006 | 2964 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2010 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
| 2014 | 0 | 0.0 | 0.0 | 0.0 |
| 2015 | 0 | 0.0 | 0.0 | 0.0 |
| 2016 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2006-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]