X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030307000

Well Details

Well ID: 0385030307000
Loading map...
Location: 00/07-03-038-03W5/0
Location Alias: 00/07-03-38-03 W5M
Location Alias 2: 00/07-03-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 03
County/Municipality: Red Deer County
Well Name: NAL ET AL SYLAKE 7-3-38-3
Operator Name: NAL Resources Limited
License Number: 0015765
License Date: 1958-08-19
License Status: Suspension
Spud Date: 1958-08-23
Final Drill Date: 1958-09-12
Well Total Depth: 2255.50 m
Surface Hole Latitude: 52.237309
Surface Hole Longitude: -114.343918

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-08-19 Obtained License
1958-09-04 Drill Stem Test Performed
1958-09-06 Drill Stem Test Performed
1958-09-08 Drill Stem Test Performed
1958-09-09 Drill Stem Test Performed
1958-09-10 Drill Stem Test Performed
1958-09-11 Drill Stem Test Performed
1958-09-12 Finished Drilling
1958-09-14 Production Casing Operation Performed
1958-09-16 Perforation Treatment Performed - Jet Perforation
1958-10-06 Well Mode changed to Drilled and Cased
1977-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-04 Well Began Production
1980-04-04 Well Fluid changed to Gas
1980-04-04 Well Mode changed to Flowing
1999-05-01 Well Fluid changed to Gas
1999-05-01 Well Mode changed to Suspended
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Flowing
2003-08-01 Well Fluid changed to Gas
2003-08-01 Well Mode changed to Suspended
2003-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-22 Plug Back Performed
2003-11-22 Well Fluid changed to Gas
2003-11-22 Well Mode changed to Abandoned Zone
2003-11-24 Perforation Treatment Performed - Jet Perforation
2003-11-24 Well Log Performed
2003-11-26 Perforation Treatment Performed - Fractured
2011-12-17 Perforation Treatment Performed - Cement Squeeze
2011-12-17 Plug Back Performed
2012-01-10 Perforation Treatment Performed - Jet Perforation
2012-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-16 Perforation 2165.60 2167.70 13
2012-01-12 Acid Treatment 2162.50 2163.50 0
2012-01-12 Acid Treatment 2161.50 2162.50 0
2012-01-12 Acid Treatment 2160.50 2161.50 0
1958-09-16 Perforation 2172.90 2179.60 13
1977-12-18 Acid Treatment 2172.90 2179.60 0
2003-11-22 Packing Device Capped w/Cement 2142.00 2150.00 0
2003-11-24 Perforation 1929.40 1932.40 17
2003-11-26 Fracture 1929.40 1932.40 0
2011-12-17 Cement Squeeze 1929.40 1932.40 0
2012-01-10 Perforation 2161.00 2163.50 17
2012-01-12 Acid Treatment 2165.60 2167.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1973 90 0.0 0.0 0.0
1980 2668 0.0 0.0 0.0
1981 1218 0.0 0.0 0.0
1984 838 0.0 0.0 0.0
1985 2557 0.0 0.0 0.0
1986 1894 0.0 0.0 0.0
1987 469 0.0 0.0 0.0
1988 878 0.0 0.0 0.0
1989 93 0.0 0.0 0.0
1993 1890 0.0 0.0 0.0
1994 706 0.0 0.0 0.0
1995 1165 0.0 0.0 0.0
1996 493 0.0 0.0 0.0
2000 3496 0.0 0.0 0.0
2001 503 0.0 0.0 0.0

For data sources see[5]

References