X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031014002

Well Details

Well ID: 0385031014002
Loading map...
Location: 00/14-10-038-03W5/2
Location Alias: 00/14-10-38-03 W5M
Location Alias 2: 00/14-10-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 10
County/Municipality: Red Deer County
Well Name: NAL ET AL SYLAKE 14-10-38-3
Operator Name: NAL Resources Limited
License Number: 0143293
License Date: 1990-02-16
License Status: Suspension
Spud Date: 1990-02-21
Final Drill Date: 1990-03-03
Well Total Depth: 2266.00 m
Surface Hole Latitude: 52.258987
Surface Hole Longitude: -114.348985

For data sources see[1][2]

Well History

Date Event
1990-02-16 Obtained License
1990-02-21 Surface Casing Operation Performed
1990-03-03 Finished Drilling
1990-03-03 Well Log Performed
1990-03-03 Well Mode changed to Drilled and Cased
1990-03-04 Well Log Performed
1990-03-06 Production Casing Operation Performed
1990-03-06 Rig Released
1990-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-23 Perforation Treatment Performed - Jet Perforation
1993-10-05 Perforation Treatment Performed - Jet Perforation
1993-10-05 Well Log Performed
1993-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-22 Perforation Treatment Performed - Jet Perforation
1993-10-22 Well Log Performed
1993-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-23 Perforation Treatment Performed - Cement Squeeze
1993-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-26 Perforation Treatment Performed - Jet Perforation
1993-10-26 Well Log Performed
1995-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-02 Plug Back Performed
1995-06-02 Well Log Performed
1995-06-03 Perforation Treatment Performed - Jet Perforation
1995-06-03 Well Log Performed
1995-06-06 Well Log Performed
1997-01-25 Well Log Performed
1997-01-27 Perforation Treatment Performed - Cement Squeeze
1997-01-27 Plug Back Performed
1997-01-31 Perforation Treatment Performed - Jet Perforation
1997-01-31 Well Log Performed
1997-02-01 Perforation Treatment Performed - Cement Squeeze
1997-02-01 Plug Back Performed
1997-02-01 Well Log Performed
1997-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-06 Perforation Treatment Performed - Jet Perforation
1997-02-06 Well Log Performed
1997-03-22 Perforation Treatment Performed - Cement Squeeze
1997-03-22 Plug Back Performed
1997-03-22 Well Log Performed
1997-03-24 Perforation Treatment Performed - Jet Perforation
1997-03-24 Well Log Performed
1997-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-09 Well Log Performed
2010-10-11 Perforation Treatment Performed - Jet Perforation
2010-10-11 Well Log Performed
2010-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-11-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-23 Perforation 2223.50 2226.00 14
1995-06-02 Packing Device Capped w/Cement 2207.00 2215.00 0
1995-06-03 Perforation 2198.00 2199.50 13
1995-06-03 Perforation 2198.00 2199.50 13
1997-01-27 Cement Squeeze 2198.00 2199.50 0
1997-01-31 Perforation 2219.50 2222.00 13
1997-01-31 Perforation 2223.50 2226.00 13
1997-02-01 Cement Squeeze 2219.50 2226.00 0
1997-02-06 Perforation 2219.00 2222.00 13
1997-02-06 Acid Treatment 2219.00 2222.00 0
1997-03-22 Cement Squeeze 2219.00 2222.00 0
1990-03-23 Acid Treatment 2223.50 2226.00 0
1997-03-24 Perforation 2211.00 2216.00 13
1997-03-25 Acid Treatment 2211.00 2216.00 0
2010-10-09 Packing Device Capped w/Cement 2195.00 2203.00 0
2010-10-11 Perforation 2168.80 2171.30 17
2010-10-11 Perforation 2171.40 2175.60 17
2010-10-11 Perforation 2176.60 2180.60 17
2010-10-11 Perforation 2185.00 2188.00 17
2010-10-14 Acid Treatment 2168.80 2171.30 0
2010-10-14 Acid Treatment 2171.40 2175.60 0
2010-10-14 Acid Treatment 2176.60 2180.60 0
1993-10-05 Perforation 2219.50 2222.00 13
2010-10-14 Acid Treatment 2185.00 2188.00 0
1993-10-07 Acid Treatment 2219.50 2226.00 0
1993-10-22 Perforation 2230.00 2231.00 13
1993-10-23 Acid Treatment 2230.00 2231.00 0
1993-10-23 Cement Squeeze 2230.00 2231.00 0
1993-10-26 Perforation 2219.50 2222.00 13
1993-10-26 Acid Treatment 2219.50 2226.00 0

For data sources see[4]



References