X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031615000

Well Details

Well ID: 0385031615000
Loading map...
Location: 00/15-16-038-03W5/0
Location Alias: 00/15-16-38-03 W5M
Location Alias 2: 00/15-16-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 16
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 15-16-38-3
Operator Name: NAL Resources Limited
License Number: 0172012
License Date: 1994-11-01
License Status: Suspension
Spud Date: 1994-11-02
Final Drill Date: 1994-11-14
Well Total Depth: 2257.00 m
Surface Hole Latitude: 52.274008
Surface Hole Longitude: -114.365269

For data sources see[1][2]

Well History

Date Event
1994-11-01 Obtained License
1994-11-02 Well Log Performed
1994-11-03 Surface Casing Operation Performed
1994-11-14 Finished Drilling
1994-11-14 Well Mode changed to Drilled and Cased
1994-11-15 Well Log Performed
1994-11-17 Well Log Performed
1994-11-18 Production Casing Operation Performed
1994-11-18 Rig Released
1994-11-18 Well Log Performed
1994-11-27 Well Log Performed
1994-11-28 Perforation Treatment Performed - Jet Perforation
1994-11-28 Well Log Performed
1994-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-07 Well Began Production
1994-12-07 Well Fluid changed to Crude Oil
1994-12-07 Well Mode changed to Pumping
1995-11-11 Perforation Treatment Performed - Jet Perforation
1995-11-11 Well Log Performed
1995-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-05 Perforation Treatment Performed - Jet Perforation
1996-12-05 Well Log Performed
1996-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-15 Well Log Performed
2002-03-16 Perforation Treatment Performed - Cement Squeeze
2002-03-16 Plug Back Performed
2002-03-16 Well Fluid changed to Crude Oil
2002-03-16 Well Mode changed to Suspended
2002-03-17 Perforation Treatment Performed - Jet Perforation
2002-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-28 Perforation 2213.50 2216.00 13
2002-03-16 Cement Squeeze 2208.00 2212.00 0
2002-03-16 Cement Squeeze 2201.00 2204.00 0
2002-03-17 Perforation 2189.50 2191.50 17
2002-12-09 Acid Treatment 2189.50 2191.50 0
1994-11-28 Perforation 2217.00 2218.00 13
1994-11-30 Acid Treatment 2213.50 2218.00 0
1995-11-11 Perforation 2208.00 2212.00 13
1995-11-13 Acid Treatment 2208.00 2218.00 0
1996-12-05 Perforation 2201.00 2204.00 13
1996-12-06 Acid Treatment 2201.00 2204.00 0
2002-03-16 Cement Squeeze 2217.00 2218.00 0
2002-03-16 Cement Squeeze 2213.50 2216.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 584 0.0 0.0 0.0
1995 8395 0.0 0.0 0.0
1996 8276 0.0 0.0 0.0
1997 8380 0.0 0.0 0.0
1998 8463 0.0 0.0 0.0
1999 8328 0.0 0.0 0.0
2000 1512 0.0 0.0 0.0

For data sources see[5]

References