X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031710002

Well Details

Well ID: 0385031710002
Loading map...
Location: 00/10-17-038-03W5/2
Location Alias: 00/10-17-38-03 W5M
Location Alias 2: 00/10-17-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 17
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 10-17MU-38-3
Operator Name: NAL Resources Limited
License Number: 0025309
License Date: 1963-12-11
License Status: Suspension
Spud Date: 1963-12-29
Final Drill Date: 1964-01-15
Well Total Depth: 2310.40 m
Surface Hole Latitude: 52.269962
Surface Hole Longitude: -114.391476

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-11 Obtained License
1964-01-10 Drill Stem Test Performed
1964-01-15 Finished Drilling
1964-01-15 Well Mode changed to Drilled and Cased
1964-01-17 Production Casing Operation Performed
1964-05-12 Perforation Treatment Performed - Jet Perforation
1964-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
1964-05-14 Perforation Treatment Performed - Jet Perforation
1964-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-15 Perforation Treatment Performed - Acid Wash - No Pressure
1964-08-15 Well Began Injection
1964-08-15 Well Fluid changed to Water
1964-08-15 Well Type changed to Disposal
1967-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-02-05 Well Fluid changed to Water
1972-02-05 Well Mode changed to Abandoned Zone
1972-02-05 Well Type changed to Disposal
1981-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-09 Perforation Treatment Performed - Jet Perforation
1981-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-21 Perforation Treatment Performed - Fractured
1994-05-04 Perforation Treatment Performed - Cement Squeeze
1994-05-10 Perforation Treatment Performed - Jet Perforation
1994-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-16 Perforation Treatment Performed - Cement Squeeze
1994-05-19 Perforation Treatment Performed - Jet Perforation
1994-05-25 Perforation Treatment Performed - Jet Perforation
1994-05-25 Well Log Performed
1994-05-26 Well Log Performed
1994-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-01 Well Fluid changed to Water
1994-07-01 Well Type changed to Injection
1994-11-15 Perforation Treatment Performed - Jet Perforation
1994-11-15 Well Log Performed
1994-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-01-01 Well Fluid changed to Water
2017-01-01 Well Mode changed to Suspended
2017-01-01 Well Type changed to Injection
2017-10-25 Perforation Treatment Performed - Cement Plug
2017-10-25 Plug Back Performed
2017-10-25 Well Fluid changed to Water
2017-10-25 Well Mode changed to Abandoned Zone
2017-10-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-05-12 Perforation 2271.70 2276.90 7
1981-01-09 Perforation 1996.80 1998.00 14
1981-01-14 Acid Treatment 1996.80 1998.00 0
1981-01-21 Fracture 1996.80 1998.00 0
1994-05-04 Cement Squeeze 1996.80 1998.00 0
1994-05-10 Perforation 2195.20 2201.30 7
1994-05-16 Acid Treatment 2195.20 2201.30 0
1994-05-16 Cement Squeeze 2195.20 2201.30 0
1994-05-19 Perforation 2271.70 2276.90 7
1994-05-25 Perforation 2265.90 2270.00 13
1994-05-25 Perforation 2271.70 2276.80 13
1964-05-13 Acid Wash 2271.70 2276.90 0
1994-05-28 Acid Treatment 2265.90 2276.90 0
1994-11-15 Perforation 2259.50 2261.30 13
1994-11-15 Perforation 2263.70 2265.30 13
1994-11-15 Perforation 2276.20 2277.50 13
1994-11-17 Acid Treatment 2259.50 2277.50 0
2003-07-24 Acid Treatment 2259.50 2277.50 0
2017-10-25 Cement Plug 1949.00 2251.00 0
1964-05-13 Acid Treatment 2271.70 2276.90 0
1964-05-14 Perforation 2195.20 2201.30 7
1964-05-15 Acid Wash 2195.20 2201.30 0
1964-05-15 Acid Treatment 2195.20 2201.30 0
1967-11-09 Acid Treatment 2271.70 2276.90 0
1972-02-05 Packing Device Capped w/Cement 2241.80 2249.40 0
1981-01-09 Packing Device Capped w/Cement 2185.00 2185.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References