X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385031803032

Well Details

Well ID: 0385031803032
Loading map...
Location: 03/03-18-038-03W5/2
Location Alias: 03/03-18-38-03 W5M
Location Alias 2: 03/03-18-038-03 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 3-18-38-3
Operator Name: NAL Resources Limited
License Number: 0086335
License Date: 1980-10-15
License Status: RecCertified
Spud Date: 1980-10-06
Final Drill Date: 1980-10-30
Well Total Depth: 2223.00 m
Surface Hole Latitude: 52.264331
Surface Hole Longitude: -114.421130

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-15 Obtained License
1980-10-30 Finished Drilling
1980-10-30 Well Mode changed to Drilled and Cased
1980-11-02 Production Casing Operation Performed
1980-11-25 Well Log Performed
1980-11-26 Perforation Treatment Performed - Jet Perforation
1980-12-01 Perforation Treatment Performed - Fractured
1980-12-11 Well Log Performed
1981-06-12 Perforation Treatment Performed - Cement Squeeze
1981-06-16 Perforation Treatment Performed - Jet Perforation
1981-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-24 Perforation Treatment Performed - Fractured
1996-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-17 Plug Back Performed
1996-02-17 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-19 Well Log Performed
1996-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-20 Plug Back Performed
1996-02-20 Well Log Performed
1996-02-21 Perforation Treatment Performed - Jet Perforation
1996-02-21 Well Log Performed
1996-03-01 Well Began Production
1996-03-01 Well Fluid changed to Crude Oil
1996-03-01 Well Mode changed to Flowing
1996-07-26 Perforation Treatment Performed - Jet Perforation
1996-07-26 Well Log Performed
1996-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-28 Perforation Treatment Performed - Jet Perforation
1996-07-28 Perforation Treatment Performed - Remedial Casing
1996-07-28 Plug Back Performed
1996-07-28 Well Log Performed
1996-07-29 Well Abandoned
1996-07-29 Well Fluid changed to Crude Oil
1996-07-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-26 Perforation 2179.00 2185.00 13
1996-02-21 Perforation 1857.00 1874.00 7
1996-07-26 Perforation 1885.00 1893.50 7
1996-07-28 Packing Device Capped w/Cement 1844.00 1852.00 0
1996-07-28 Perforation 405.00 405.50 7
1996-07-28 Remedial Casing Cementing 405.00 405.50 0
1980-12-01 Fracture 2179.00 2185.00 0
1981-06-12 Cement Squeeze 2179.00 2185.00 0
1981-06-16 Perforation 2193.00 2196.00 13
1981-06-18 Acid Treatment 2193.00 2196.00 0
1981-06-24 Fracture 2193.00 2196.00 0
1996-02-17 Packing Device Capped w/Cement 2161.00 2170.00 0
1996-02-19 Perforation 2006.50 2009.50 7
1996-02-20 Packing Device Capped w/Cement 1992.00 2000.00 0

For data sources see[4]



References