If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0385040206030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.238589,"lon":-114.46878,"icon":""}]} |
| Location: 03/06-02-038-04W5/0 | |
| Location Alias: 03/06-02-38-04 W5M | |
| Location Alias 2: 03/06-02-038-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 02 | |
| County/Municipality: Clearwater County | |
| Well Name: CERTUS SYLAKE 6-2-38-4 | |
| Operator Name: Certus Oil And Gas Inc. | |
| License Number: 0134139 | |
| License Date: 1988-06-03 | |
| License Status: Suspension | |
| Spud Date: 1988-06-18 | |
| Final Drill Date: 1988-07-04 | |
| Well Total Depth: 2365.00 m | |
| Surface Hole Latitude: 52.238589 | |
| Surface Hole Longitude: -114.468780 |
| Date | Event |
|---|---|
| 1988-06-03 | Obtained License |
| 1988-06-18 | Surface Casing Operation Performed |
| 1988-07-04 | Finished Drilling |
| 1988-07-05 | Drill Stem Test Performed |
| 1988-07-05 | Well Log Performed |
| 1988-07-07 | Drill Stem Test Performed |
| 1988-07-08 | Drill Stem Test Performed |
| 1988-07-09 | Drill Stem Test Performed |
| 1988-07-11 | Production Casing Operation Performed |
| 1988-07-11 | Rig Released |
| 1988-08-02 | Well Log Performed |
| 1988-08-03 | Well Log Performed |
| 1988-08-04 | Perforation Treatment Performed - Jet Perforation |
| 1988-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-10-12 | Plug Back Performed |
| 1988-10-12 | Well Log Performed |
| 1988-10-13 | Perforation Treatment Performed - Jet Perforation |
| 1988-10-13 | Well Log Performed |
| 1988-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-10-19 | Well Log Performed |
| 1988-10-20 | Well Log Performed |
| 1988-10-21 | Perforation Treatment Performed - Jet Perforation |
| 1988-10-25 | Perforation Treatment Performed - Jet Perforation |
| 1988-10-25 | Well Log Performed |
| 1988-10-29 | Perforation Treatment Performed - Fractured |
| 1990-08-15 | Well Mode changed to Drilled and Cased |
| 1990-09-01 | Perforation Treatment Performed - Cement Squeeze |
| 1990-09-14 | Perforation Treatment Performed - Jet Perforation |
| 1990-11-28 | Well Began Production |
| 1990-11-28 | Well Fluid changed to Crude Oil |
| 1990-11-28 | Well Mode changed to Pumping |
| 1990-12-06 | Well Fluid changed to Crude Oil |
| 1990-12-06 | Well Mode changed to Suspended |
| 1991-08-28 | Well Fluid changed to Crude Oil |
| 1991-08-28 | Well Mode changed to Pumping |
| 2000-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2000-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-12-14 | Perforation Treatment Performed - Jet Perforation |
| 2007-12-14 | Well Log Performed |
| 2007-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2014-07-01 | Well Fluid changed to Crude Oil |
| 2014-07-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-08-04 | Perforation | 2332.50 | 2337.50 | 13 |
| 1988-10-29 | Fracture | 2271.00 | 2285.00 | 0 |
| 1990-09-01 | Cement Squeeze | 2271.00 | 2285.00 | 0 |
| 1990-09-14 | Perforation | 2332.50 | 2337.50 | 13 |
| 1990-09-14 | Perforation | 2338.50 | 2340.50 | 13 |
| 2000-10-01 | Acid Treatment | 2332.50 | 2340.50 | 0 |
| 2000-11-18 | Acid Treatment | 2289.50 | 2305.50 | 0 |
| 2007-12-14 | Perforation | 2345.50 | 2346.50 | 17 |
| 2007-12-14 | Perforation | 2329.00 | 2332.50 | 17 |
| 2007-12-16 | Acid Treatment | 2329.00 | 2346.50 | 0 |
| 2007-12-16 | Acid Treatment | 2289.50 | 2305.00 | 0 |
| 1988-08-04 | Perforation | 2338.50 | 2340.50 | 13 |
| 1988-08-05 | Acid Treatment | 2332.50 | 2340.50 | 0 |
| 1988-10-12 | Packing Device Capped w/Cement | 2319.00 | 2327.00 | 0 |
| 1988-10-13 | Perforation | 2289.50 | 2296.00 | 13 |
| 1988-10-13 | Perforation | 2300.50 | 2305.00 | 13 |
| 1988-10-14 | Acid Treatment | 2289.50 | 2305.00 | 0 |
| 1988-10-21 | Perforation | 2283.00 | 2285.00 | 13 |
| 1988-10-25 | Perforation | 2271.00 | 2275.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1988 | 76 | 0.0 | 0.0 | 0.0 |
| 1990 | 55 | 0.0 | 0.0 | 0.0 |
| 1991 | 845 | 0.0 | 0.0 | 0.0 |
| 1993 | 232 | 0.0 | 0.0 | 0.0 |
| 1994 | 4526 | 0.0 | 0.0 | 0.0 |
| 1995 | 600 | 0.0 | 0.0 | 0.0 |
| 1996 | 3087 | 0.0 | 0.0 | 0.0 |
| 1997 | 8526 | 0.0 | 0.0 | 0.0 |
| 1998 | 8349 | 0.0 | 0.0 | 0.0 |
| 1999 | 8256 | 0.0 | 0.0 | 0.0 |
| 2000 | 8590 | 0.0 | 0.0 | 0.0 |
| 2001 | 8248 | 0.0 | 0.0 | 0.0 |
| 2002 | 8655 | 0.0 | 0.0 | 0.0 |
| 2003 | 8159 | 0.0 | 0.0 | 0.0 |
| 2004 | 8426 | 0.0 | 0.0 | 0.0 |
| 2005 | 8317 | 0.0 | 0.0 | 0.0 |
| 2006 | 8550 | 0.0 | 0.0 | 0.0 |
| 2007 | 7760 | 0.0 | 0.0 | 0.0 |
| 2008 | 6159 | 0.0 | 0.0 | 0.0 |
| 2010 | 2160 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8325 | 0.0 | 0.0 | 0.0 |
| 2013 | 5959 | 0.0 | 0.0 | 0.0 |
| 2014 | 2566 | 0.0 | 0.0 | 0.0 |
For data sources see[5]