X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385040711000

Well Details

Well ID: 0385040711000
Loading map...
Location: 00/11-07-038-04W5/0
Location Alias: 00/11-07-38-04 W5M
Location Alias 2: 00/11-07-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 07
County/Municipality: Clearwater County
Well Name: CERTUS SYLAKE 11-7-38-4
Operator Name: Certus Oil And Gas Inc.
License Number: 0123588
License Date: 1986-08-05
License Status: Suspension
Spud Date: 1986-09-04
Final Drill Date: 1986-10-22
Well Total Depth: 3060.00 m
Surface Hole Latitude: 52.254574
Surface Hole Longitude: -114.564771

For data sources see[1][2]

Well History

Date Event
1986-08-05 Obtained License
1986-09-07 Surface Casing Operation Performed
1986-09-25 Direction Drilling Operation Performed - Deviate
1986-10-12 Drill Stem Test Performed
1986-10-14 Drill Stem Test Performed
1986-10-15 Drill Stem Test Performed
1986-10-18 Drill Stem Test Performed
1986-10-22 Finished Drilling
1986-10-22 Well Mode changed to Drilled and Cased
1986-10-23 Well Log Performed
1986-10-25 Drill Stem Test Performed
1986-10-28 Production Casing Operation Performed
1986-10-30 Rig Released
1986-11-11 Well Log Performed
1986-11-30 Well Log Performed
1986-12-01 Perforation Treatment Performed - Jet Perforation
1986-12-01 Well Log Performed
1986-12-03 Perforation Treatment Performed - Acid Wash - No Pressure
1986-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-08 Perforation Treatment Performed - Cement Squeeze
1986-12-11 Perforation Treatment Performed - Jet Perforation
1986-12-11 Well Log Performed
1986-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-15 Well Log Performed
1986-12-16 Perforation Treatment Performed - Cement Squeeze
1986-12-19 Perforation Treatment Performed - Jet Perforation
1986-12-19 Well Began Production
1986-12-19 Well Fluid changed to Crude Oil
1986-12-19 Well Mode changed to Flowing
1986-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-17 Well Fluid changed to Crude Oil
1987-01-17 Well Mode changed to Suspended
1987-07-01 Well Fluid changed to Crude Oil
1987-07-01 Well Mode changed to Flowing
1989-06-02 Well Log Performed
1989-07-18 Perforation Treatment Performed - Jet Perforation
1989-07-18 Well Log Performed
1989-07-19 Well Log Performed
1989-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-03 Perforation Treatment Performed - Casing Patch (Over Perfs)
1992-05-03 Well Log Performed
1995-02-28 Perforation Treatment Performed - Jet Perforation
1995-02-28 Well Log Performed
1995-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-04 Well Log Performed
2007-03-08 Well Log Performed
2008-11-01 Well Fluid changed to Crude Oil
2008-11-01 Well Mode changed to Suspended
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Pumping
2013-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-15 Plug Back Performed
2013-11-15 Well Fluid changed to Crude Oil
2013-11-15 Well Log Performed
2013-11-15 Well Mode changed to Abandoned Zone
2013-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-16 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-09-25 2491.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-01 Perforation 2920.50 2922.00 13
1986-12-19 Perforation 3019.00 3023.00 13
1986-12-20 Acid Treatment 3019.00 3023.00 0
1989-07-18 Perforation 3010.50 3011.50 13
1989-07-18 Perforation 3012.50 3013.50 13
1989-07-18 Perforation 3014.50 3015.50 13
1989-07-22 Acid Treatment 3010.50 3015.50 0
1992-05-03 Casing Patch 3019.00 3023.00 0
1995-02-28 Perforation 3008.00 3009.50 14
1995-03-03 Acid Treatment 3008.00 3009.50 0
2004-03-29 Acid Treatment 3008.00 3009.50 0
1986-12-03 Acid Wash 2920.50 2922.00 0
2004-03-29 Acid Treatment 3010.50 3011.50 0
2013-11-15 Packing Device Capped w/Cement 2997.00 3005.00 0
2013-11-16 Packing Device Capped w/Cement 2902.00 2910.00 0
1986-12-05 Acid Treatment 2920.50 2922.00 0
1986-12-07 Acid Treatment 2920.50 2922.00 0
1986-12-08 Cement Squeeze 2920.50 2922.00 0
1986-12-11 Perforation 2913.00 2920.00 13
1986-12-12 Acid Treatment 2913.00 2920.00 0
1986-12-13 Acid Treatment 2913.00 2920.00 0
1986-12-16 Cement Squeeze 2913.00 2920.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 24 0.0 0.0 0.0
1987 2809 0.0 0.0 0.0
1988 6065 0.0 0.0 0.0
1989 5922 0.0 0.0 0.0
1990 8273 0.0 0.0 0.0
1991 8522 0.0 0.0 0.0
1992 7439 0.0 0.0 0.0
1993 7449 0.0 0.0 0.0
1994 8453 0.0 0.0 0.0
1995 7631 0.0 0.0 0.0
1996 8461 0.0 0.0 0.0
1997 6880 0.0 0.0 0.0
1998 7299 0.0 0.0 0.0
1999 7948 0.0 0.0 0.0
2000 7795 0.0 0.0 0.0
2001 8538 0.0 0.0 0.0
2002 8358 0.0 0.0 0.0
2003 8193 0.0 0.0 0.0
2004 7298 0.0 0.0 0.0
2005 1416 0.0 0.0 0.0
2013 1217 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-22 No Incident Encountered 0.00 0.00
2013-11-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References