X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385041614000

Well Details

Well ID: 0385041614000
Loading map...
Location: 00/14-16-038-04W5/0
Location Alias: 00/14-16-38-04 W5M
Location Alias 2: 00/14-16-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 16
County/Municipality: Clearwater County
Well Name: CERTUS MEDRIV 14-16-38-4
Operator Name: Certus Oil And Gas Inc.
License Number: 0115486
License Date: 1985-06-20
License Status: Amended
Spud Date: 1985-07-02
Final Drill Date: 1985-08-06
Well Total Depth: 3148.00 m
Surface Hole Latitude: 52.273825
Surface Hole Longitude: -114.513627

For data sources see[1][2]

Well History

Date Event
1985-06-20 Obtained License
1985-07-05 Surface Casing Operation Performed
1985-08-06 Finished Drilling
1985-08-06 Well Mode changed to Drilled and Cased
1985-08-07 Well Log Performed
1985-08-08 Well Log Performed
1985-08-09 Well Log Performed
1985-08-10 Drill Stem Test Performed
1985-08-11 Kick Occurred
1985-08-14 Well Log Performed
1985-08-15 Production Casing Operation Performed
1985-08-16 Rig Released
1985-10-06 Well Log Performed
1985-10-08 Perforation Treatment Performed - Jet Perforation
1985-10-08 Well Log Performed
1985-11-14 Well Began Production
1985-11-14 Well Fluid changed to Crude Oil
1985-11-14 Well Mode changed to Flowing
1986-07-31 Well Log Performed
1987-07-16 Perforation Treatment Performed - Jet Perforation
1987-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-19 Well Fluid changed to Crude Oil
1987-07-19 Well Mode changed to Pumping
1988-07-27 Perforation Treatment Performed - Jet Perforation
1988-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-28 Perforation Treatment Performed - Cement Squeeze
1988-08-04 Perforation Treatment Performed - Jet Perforation
1988-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-12 Well Fluid changed to Crude Oil
1988-10-12 Well Mode changed to Suspended
1989-09-20 Perforation Treatment Performed - Cement Squeeze
1989-09-25 Well Log Performed
1989-09-28 Perforation Treatment Performed - Jet Perforation
1989-09-28 Well Log Performed
1989-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-01 Well Began Injection
1989-11-01 Well Fluid changed to Water
1989-11-01 Well Type changed to Disposal
1989-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-08 Perforation 3097.00 3099.00 13
1989-09-28 Perforation 3126.50 3130.00 16
1989-09-29 Acid Treatment 3126.50 3130.00 0
1989-11-23 Acid Treatment 3126.50 3130.00 0
1990-12-14 Acid Treatment 3126.50 3130.00 0
1991-04-30 Acid Treatment 3126.50 3130.00 0
1992-04-10 Acid Treatment 3126.50 3130.00 0
1994-03-31 Acid Treatment 3126.50 3130.00 0
1999-03-30 Acid Treatment 3126.50 3130.00 0
2004-04-15 Acid Treatment 3126.50 3130.00 0
2005-08-20 Acid Treatment 3126.50 3130.00 0
1987-07-16 Perforation 3096.60 3097.60 13
2007-05-09 Acid Treatment 3126.50 3130.00 0
2009-01-30 Acid Treatment 3126.50 3130.00 0
2018-10-10 Acid Treatment 3126.50 3130.00 0
2019-03-18 Acid Treatment 3126.50 3130.00 0
2019-11-19 Acid Treatment 3126.50 3130.00 0
1987-07-17 Acid Treatment 3096.60 3097.60 0
1988-07-27 Perforation 3106.00 3108.00 13
1988-07-28 Acid Treatment 3106.00 3108.00 0
1988-07-28 Cement Squeeze 3096.60 3108.00 0
1988-08-04 Perforation 3096.50 3098.50 13
1988-08-05 Acid Treatment 3096.50 3098.50 0
1989-09-20 Cement Squeeze 3096.50 3098.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 498 0.0 0.0 0.0
1986 6062 0.0 0.0 0.0
1987 2158 0.0 0.0 0.0
1988 1195 0.0 0.0 0.0
1989 48 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-11 Kick 3148.00 3148.00
2018-10-10 No Incident Encountered 0.00 0.00
2019-03-18 No Incident Encountered 0.00 0.00
2019-11-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References