X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385043313000

Well Details

Well ID: 0385043313000
Loading map...
Location: 00/13-33-038-04W5/0
Location Alias: 00/13-33-38-04 W5M
Location Alias 2: 00/13-33-038-04 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 33
County/Municipality: Clearwater County
Well Name: NAL MEDRIV 13-33-38-4
Operator Name: NAL Resources Limited
License Number: 0218355
License Date: 1998-10-28
License Status: Suspension
Spud Date: 1998-11-23
Final Drill Date: 1998-12-01
Well Total Depth: 2348.00 m
Surface Hole Latitude: 52.318332
Surface Hole Longitude: -114.524313

For data sources see[1][2]

Well History

Date Event
1998-10-28 Obtained License
1998-11-25 Surface Casing Operation Performed
1998-12-01 Finished Drilling
1998-12-01 Well Log Performed
1998-12-02 Well Log Performed
1998-12-03 Production Casing Operation Performed
1998-12-04 Rig Released
1998-12-04 Well Mode changed to Drilled and Cased
1998-12-17 Perforation Treatment Performed - Jet Perforation
1998-12-17 Well Log Performed
1998-12-20 Perforation Treatment Performed - Fractured
1998-12-20 Perforation Treatment Performed - Jet Perforation
1999-02-24 Perforation Treatment Performed - Casing Patch (Over Perfs)
1999-03-01 Well Began Production
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Pumping
2003-03-15 Perforation Treatment Performed - Cement Squeeze
2003-03-15 Well Fluid changed to Crude Oil
2003-03-15 Well Mode changed to Suspended
2003-03-28 Perforation Treatment Performed - Jet Perforation
2003-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-17 Perforation 2309.00 2314.00 13
1998-12-20 Perforation 2286.00 2290.50 13
1998-12-20 Perforation 2291.50 2292.50 13
1998-12-20 Perforation 2295.70 2297.50 13
1998-12-20 Fracture 2295.70 2297.50 0
1999-02-24 Casing Patch 2309.00 2314.00 0
2003-03-15 Cement Squeeze 2286.00 2297.50 0
2003-03-28 Perforation 2309.00 2314.00 13
2003-03-29 Acid Treatment 2309.00 2314.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6713 0.0 0.0 0.0
2000 7265 0.0 0.0 0.0
2001 7550 0.0 0.0 0.0
2002 6399 0.0 0.0 0.0

For data sources see[5]

References