X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394043309A00

Well Details

Well ID: 0394043309A00
Loading map...
Location: A0/09-33-039-04W4/0
Location Alias: A0/09-33-39-04 W4M
Location Alias 2: A0/09-33-039-04 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 04
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1A0 PROVOST 9-33-39-4
Operator Name: West Lake Energy Corp.
License Number: 0126841
License Date: 1987-06-11
License Status: RecCertified
Spud Date: 1987-06-20
Final Drill Date: 1987-06-22
Well Total Depth: 821.00 m
Surface Hole Latitude: 52.398027
Surface Hole Longitude: -110.510383

For data sources see[1][2]

Well History

Date Event
1987-06-11 Obtained License
1987-06-21 Surface Casing Operation Performed
1987-06-22 Finished Drilling
1987-06-22 Production Casing Operation Performed
1987-06-22 Well Log Performed
1987-06-22 Well Mode changed to Drilled and Cased
1987-06-23 Rig Released
1987-06-29 Perforation Treatment Performed - Jet Perforation
1987-06-29 Well Began Production
1987-06-29 Well Fluid changed to Crude Oil
1987-06-29 Well Mode changed to Pumping
1988-07-06 Perforation Treatment Performed - Cement Squeeze
1988-07-08 Perforation Treatment Performed - Jet Perforation
1997-09-30 Well Fluid changed to Crude Oil
1997-09-30 Well Mode changed to Suspended
1999-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-19 Perforation Treatment Performed - Jet Perforation
1999-09-19 Plug Back Performed
1999-09-19 Well Fluid changed to Crude Oil
1999-09-19 Well Mode changed to Abandoned Zone
2007-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-09 Plug Back Performed
2007-01-18 Well Log Performed
2007-01-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-06-29 Perforation 793.50 795.00 13
1988-07-06 Cement Squeeze 793.50 795.00 0
1988-07-08 Perforation 793.50 795.00 13
1999-09-19 Packing Device Capped w/Cement 783.00 791.00 0
1999-09-19 Perforation 700.00 700.50 13
2007-01-09 Packing Device Capped w/Cement 685.00 693.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4203 0.0 0.0 0.0
1988 8089 0.0 0.0 0.0
1989 8292 0.0 0.0 0.0
1990 8386 0.0 0.0 0.0
1991 8466 0.0 0.0 0.0
1992 8682 0.0 0.0 0.0
1993 8717 0.0 0.0 0.0
1994 8719 0.0 0.0 0.0
1995 8638 0.0 0.0 0.0
1996 8754 0.0 0.0 0.0
1997 6196 0.0 0.0 0.0

For data sources see[5]

References