If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394043311A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.399151,"lon":-110.523459,"icon":""}]} |
Location: A0/11-33-039-04W4/0 | |
Location Alias: A0/11-33-39-04 W4M | |
Location Alias 2: A0/11-33-039-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 04 | |
Section: 33 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 11-33-39-4 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0133559 | |
License Date: 1988-04-28 | |
License Status: Abandoned | |
Spud Date: 1988-04-29 | |
Final Drill Date: 1988-05-01 | |
Well Total Depth: 819.00 m | |
Surface Hole Latitude: 52.399151 | |
Surface Hole Longitude: -110.523459 |
Date | Event |
---|---|
1988-04-28 | Obtained License |
1988-04-29 | Surface Casing Operation Performed |
1988-05-01 | Finished Drilling |
1988-05-01 | Well Log Performed |
1988-05-01 | Well Mode changed to Drilled and Cased |
1988-05-02 | Production Casing Operation Performed |
1988-05-02 | Rig Released |
1988-05-04 | Perforation Treatment Performed - Jet Perforation |
1988-05-06 | Well Began Production |
1988-05-06 | Well Fluid changed to Crude Oil |
1988-05-06 | Well Mode changed to Pumping |
1992-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-07 | Plug Back Performed |
1992-06-07 | Well Abandoned |
1992-06-07 | Well Fluid changed to Crude Oil |
1992-06-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-05-04 | Perforation | 789.00 | 791.00 | 13 |
1992-06-07 | Packing Device Capped w/Cement | 774.00 | 782.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 4340 | 0.0 | 0.0 | 0.0 |
1989 | 8499 | 0.0 | 0.0 | 0.0 |
1990 | 8079 | 0.0 | 0.0 | 0.0 |
1991 | 6496 | 0.0 | 0.0 | 0.0 |
1992 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]