X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394043610100

Well Details

Well ID: 0394043610100
Loading map...
Location: 10/10-36-039-04W4/0
Location Alias: 10/10-36-39-04 W4M
Location Alias 2: 10/10-36-039-04 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 04
Section: 36
County/Municipality: Municipal District of Provost No. 52
Well Name: ACL 10C(2) PROVOST 10-36-39-4
Operator Name: Battle River Energy Ltd.
License Number: 0189314
License Date: 1996-07-05
License Status: Suspension
Spud Date: 1996-08-13
Final Drill Date: 1996-08-17
Well Total Depth: 863.00 m
Surface Hole Latitude: 52.399788
Surface Hole Longitude: -110.449136

For data sources see[1][2]

Well History

Date Event
1996-07-05 Obtained License
1996-08-13 Well Log Performed
1996-08-14 Surface Casing Operation Performed
1996-08-15 Direction Drilling Operation Performed - Deviate
1996-08-17 Finished Drilling
1996-08-17 Production Casing Operation Performed
1996-08-17 Rig Released
1996-08-17 Well Log Performed
1996-08-17 Well Mode changed to Drilled and Cased
1996-08-19 Well Log Performed
1996-08-27 Well Log Performed
1996-08-28 Perforation Treatment Performed - Jet Perforation
1996-09-15 Well Began Production
1996-09-15 Well Fluid changed to Crude Oil
1996-09-15 Well Mode changed to Pumping
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Suspended
2000-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-05 Perforation Treatment Performed - Jet Perforation
2000-10-05 Plug Back Performed
2000-10-05 Well Fluid changed to Crude Oil
2000-10-05 Well Log Performed
2000-10-05 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-15 320.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-28 Perforation 779.60 780.80 18
2000-10-05 Packing Device Capped w/Cement 767.00 775.00 0
2000-10-05 Perforation 750.00 751.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2476 0.0 0.0 0.0
1997 8554 0.0 0.0 0.0
1998 3333 0.0 0.0 0.0

For data sources see[6]

References