X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394061603002

Well Details

Well ID: 0394061603002
Loading map...
Location: 00/03-16-039-06W4/2
Location Alias: 00/03-16-39-06 W4M
Location Alias 2: 00/03-16-039-06 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 06
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: ACL PROVO 3-16-39-6
Operator Name: Paramount Resources Ltd.
License Number: 0325722
License Date: 2005-02-07
License Status: RecCertified
Spud Date: 2005-02-08
Final Drill Date: 2005-02-09
Well Total Depth: 844.00 m
Surface Hole Latitude: 52.349980
Surface Hole Longitude: -110.812137

For data sources see[1][2]

Well History

Date Event
2005-02-07 Obtained License
2005-02-08 Surface Casing Operation Performed
2005-02-09 Finished Drilling
2005-02-09 Well Log Performed
2005-02-09 Well Mode changed to Drilled and Cased
2005-02-10 Production Casing Operation Performed
2005-02-10 Well Log Performed
2005-02-11 Rig Released
2005-02-13 Perforation Treatment Performed - Jet Perforation
2005-02-13 Well Log Performed
2005-02-15 Perforation Treatment Performed - Jet Perforation
2005-02-15 Well Log Performed
2005-02-22 Well Log Performed
2005-02-25 Perforation Treatment Performed - Fractured
2006-07-13 Well Log Performed
2006-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-14 Plug Back Performed
2006-07-14 Well Mode changed to Abandoned Zone
2006-07-17 Well Log Performed
2006-07-19 Well Log Performed
2006-07-20 Perforation Treatment Performed - Jet Perforation
2006-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-21 Perforation Treatment Performed - Remedial Casing
2006-07-28 Well Abandoned
2006-07-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-13 Perforation 716.00 717.50 17
2006-07-21 Packing Device Capped w/Cement 103.50 143.50 0
2005-02-13 Perforation 724.00 726.00 17
2005-02-15 Perforation 796.20 797.50 13
2005-02-25 Fracture 716.00 726.00 0
2006-07-14 Packing Device Capped w/Cement 778.00 786.00 0
2006-07-14 Packing Device Capped w/Cement 702.00 710.00 0
2006-07-20 Perforation 148.00 149.00 99
2006-07-20 Perforation 157.00 158.00 99
2006-07-21 Remedial Casing Cementing 148.00 158.00 0

For data sources see[4]



References