X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394062116000

Well Details

Well ID: 0394062116000
Loading map...
Location: 00/16-21-039-06W4/0
Location Alias: 00/16-21-39-06 W4M
Location Alias 2: 00/16-21-039-06 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 06
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: RSO HZ PROVOST 16-21-39-6
Operator Name: Rifle Shot Oil Corp.
License Number: 0480070
License Date: 2016-08-11
License Status: Issued
Spud Date: 2016-08-16
Final Drill Date: 2016-08-23
Well Total Depth: 2250.00 m
Surface Hole Latitude: 52.362257
Surface Hole Longitude: -110.783572

For data sources see[1][2]

Well History

Date Event
2016-08-11 Obtained License
2016-08-17 Surface Casing Operation Performed
2016-08-18 Direction Drilling Operation Performed - Deviate
2016-08-20 Direction Drilling Operation Performed - Horizontal
2016-08-23 Finished Drilling
2016-08-23 Well Log Performed
2016-08-23 Well Mode changed to Drilled and Cased
2016-08-24 Production Casing Operation Performed
2016-08-24 Rig Released
2016-09-01 Perforation Treatment Performed - Jet Perforation
2016-09-13 Well Began Production
2016-09-13 Well Fluid changed to Crude Oil
2016-09-13 Well Mode changed to Pumping
2018-07-18 Perforation Treatment Performed - Jet Perforation
2019-09-26 Perforation Treatment Performed - Jet Perforation
2019-09-27 Perforation Treatment Performed - Cement Squeeze
2019-10-01 Perforation Treatment Performed - Jet Perforation
2020-02-26 Perforation Treatment Performed - Jet Perforation
2020-02-27 Perforation Treatment Performed - Cement Squeeze
2020-02-28 Perforation Treatment Performed - Jet Perforation
2020-03-04 Perforation Treatment Performed - Jet Perforation
2020-03-05 Perforation Treatment Performed - Cement Squeeze
2020-03-06 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-16 Savanna Drilling Corp. 432 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-18 520.40 Deviate (5 - 79 degrees)
2016-08-20 1025.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-01 Perforation 2030.00 2140.00 7
2020-03-04 Perforation 1191.00 1192.00 20
2020-03-05 Cement Squeeze 1191.00 1192.00 0
2020-03-06 Perforation 1090.00 1160.00 7
2016-09-01 Perforation 1850.00 2020.00 7
2018-07-18 Perforation 1650.00 1775.00 7
2019-09-26 Perforation 1638.00 1639.00 20
2019-09-27 Cement Squeeze 1638.00 1639.00 0
2019-10-01 Perforation 1400.00 1625.00 7
2020-02-26 Perforation 1364.00 1365.00 20
2020-02-27 Cement Squeeze 1364.00 1365.00 0
2020-02-28 Perforation 1200.00 1300.00 7

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2604 0.0 0.0 0.0
2017 8524 0.0 0.0 0.0
2018 8216 0.0 0.0 0.0
2019 8467 0.0 0.0 0.0
2020 1758 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-24 No Incident Encountered 0.00 0.00
2016-08-27 No Incident Encountered 0.00 0.00
2018-07-15 No Incident Encountered 0.00 0.00
2019-09-25 No Incident Encountered 0.00 0.00
2020-02-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References