If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394083306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.395279,"lon":-111.100336,"icon":""}]} |
Location: 00/06-33-039-08W4/0 | |
Location Alias: 00/06-33-39-08 W4M | |
Location Alias 2: 00/06-33-039-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ACL ET AL PROVOST 6-33-39-8 | |
Operator Name: Battle River Energy Ltd. | |
License Number: 0018510 | |
License Date: 1960-01-14 | |
License Status: Abandoned | |
Spud Date: 1960-01-15 | |
Final Drill Date: 1960-01-21 | |
Well Total Depth: 778.20 m | |
Surface Hole Latitude: 52.395279 | |
Surface Hole Longitude: -111.100336 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-01-14 | Obtained License |
1960-01-21 | Drill Stem Test Performed |
1960-01-21 | Finished Drilling |
1960-01-23 | Production Casing Operation Performed |
1960-02-01 | Perforation Treatment Performed - Jet Perforation |
1960-02-03 | Perforation Treatment Performed - Fractured |
1961-01-16 | Well Mode changed to Drilled and Cased |
1977-06-18 | Well Began Production |
1977-06-18 | Well Fluid changed to Crude Oil |
1977-06-18 | Well Mode changed to Flowing |
1977-10-25 | Well Fluid changed to Crude Oil |
1977-10-25 | Well Mode changed to Suspended |
2000-07-11 | Well Fluid changed to Crude Oil |
2000-07-11 | Well Mode changed to Pumping |
2010-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-03 | Plug Back Performed |
2010-03-03 | Well Fluid changed to Crude Oil |
2010-03-03 | Well Log Performed |
2010-03-03 | Well Mode changed to Abandoned Zone |
2010-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-04 | Perforation Treatment Performed - Jet Perforation |
2010-03-04 | Well Log Performed |
2010-03-05 | Perforation Treatment Performed - Jet Perforation |
2010-03-05 | Well Log Performed |
2010-03-06 | Perforation Treatment Performed - Cement Plug |
2010-03-09 | Well Abandoned |
2010-03-09 | Well Fluid changed to Crude Oil |
2010-03-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-02-01 | Perforation | 755.60 | 756.20 | 13 |
2010-03-05 | Perforation | 225.60 | 226.60 | 20 |
2010-03-05 | Perforation | 255.40 | 256.50 | 20 |
2010-03-05 | Perforation | 260.90 | 261.90 | 20 |
2010-03-05 | Perforation | 276.10 | 277.10 | 20 |
2010-03-05 | Perforation | 320.40 | 321.40 | 20 |
2010-03-06 | Cement Plug | 111.20 | 332.90 | 0 |
1960-02-03 | Fracture | 755.60 | 756.20 | 0 |
2010-03-03 | Packing Device Capped w/Cement | 740.00 | 748.00 | 0 |
2010-03-04 | Perforation | 489.00 | 490.00 | 14 |
2010-03-04 | Packing Device Capped w/Cement | 477.00 | 485.00 | 0 |
2010-03-04 | Perforation | 355.00 | 356.00 | 14 |
2010-03-04 | Packing Device Capped w/Cement | 343.00 | 351.00 | 0 |
2010-03-05 | Perforation | 131.70 | 132.70 | 20 |
2010-03-05 | Perforation | 158.50 | 159.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 3043 | 0.0 | 0.0 | 0.0 |
2000 | 2948 | 0.0 | 0.0 | 0.0 |
2001 | 7146 | 0.0 | 0.0 | 0.0 |
2002 | 8744 | 0.0 | 0.0 | 0.0 |
2003 | 8626 | 0.0 | 0.0 | 0.0 |
2004 | 1896 | 0.0 | 0.0 | 0.0 |
2006 | 24 | 0.0 | 0.0 | 0.0 |
2007 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]