X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394091211000

Well Details

Well ID: 0394091211000
Loading map...
Location: 00/11-12-039-09W4/0
Location Alias: 00/11-12-39-09 W4M
Location Alias 2: 00/11-12-039-09 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 09
Section: 12
County/Municipality: County of Paintearth No. 18
Well Name: ACL ET AL PROVO 11-12-39-9
Operator Name: Battle River Energy Ltd.
License Number: 0008269
License Date: 1954-07-23
License Status: Abandoned
Spud Date: 1954-07-27
Final Drill Date: 1954-08-01
Well Total Depth: 791.00 m
Surface Hole Latitude: 52.340991
Surface Hole Longitude: -111.171100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-23 Obtained License
1954-08-01 Finished Drilling
1954-08-01 Production Casing Operation Performed
1954-08-01 Well Mode changed to Drilled and Cased
1961-08-25 Perforation Treatment Performed - Jet Perforation
1962-02-24 Well Began Production
1962-02-24 Well Fluid changed to Gas
1962-02-24 Well Mode changed to Flowing
1986-12-01 Well Fluid changed to Gas
1986-12-01 Well Mode changed to Suspended
2000-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-27 Perforation Treatment Performed - Jet Perforation
2000-10-27 Plug Back Performed
2000-10-27 Well Fluid changed to Gas
2000-10-27 Well Log Performed
2000-10-27 Well Mode changed to Abandoned Zone
2000-10-28 Perforation Treatment Performed - Cement Plug
2000-10-28 Perforation Treatment Performed - Remedial Casing
2000-11-09 Well Abandoned
2000-11-09 Well Fluid changed to Gas
2000-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-25 Perforation 771.10 772.10 7
1961-08-25 Perforation 772.70 773.90 7
2000-10-27 Packing Device Capped w/Cement 754.00 762.00 0
2000-10-27 Perforation 227.00 228.00 14
2000-10-28 Remedial Casing Cementing 227.00 228.00 0
2000-10-28 Cement Plug 187.80 223.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1971 552 0.0 0.0 0.0

For data sources see[5]

References