X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394100506002

Well Details

Well ID: 0394100506002
Loading map...
Location: 00/06-05-039-10W4/2
Location Alias: 00/06-05-39-10 W4M
Location Alias 2: 00/06-05-039-10 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 05
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 6-5-39-10
Operator Name: Karve Energy Inc.
License Number: 0232447
License Date: 2000-01-21
License Status: Issued
Spud Date: 2000-02-04
Final Drill Date: 2000-02-07
Well Total Depth: 977.00 m
Surface Hole Latitude: 52.323168
Surface Hole Longitude: -111.409828

For data sources see[1][2]

Well History

Date Event
2000-01-21 Obtained License
2000-02-03 Well Log Performed
2000-02-05 Surface Casing Operation Performed
2000-02-07 Finished Drilling
2000-02-07 Well Mode changed to Drilled and Cased
2000-02-08 Production Casing Operation Performed
2000-02-08 Rig Released
2000-02-08 Well Log Performed
2000-02-14 Perforation Treatment Performed - Jet Perforation
2000-02-14 Well Log Performed
2000-03-21 Well Log Performed
2000-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-22 Perforation Treatment Performed - Jet Perforation
2000-03-23 Perforation Treatment Performed - Cement Squeeze
2000-03-23 Plug Back Performed
2000-03-23 Well Log Performed
2000-03-28 Perforation Treatment Performed - Jet Perforation
2000-03-28 Well Log Performed
2006-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-04 Perforation Treatment Performed - Jet Perforation
2006-08-04 Plug Back Performed
2006-08-04 Well Log Performed
2006-08-18 Perforation Treatment Performed - Fractured
2006-11-19 Well Began Production
2006-11-19 Well Fluid changed to Gas
2006-11-19 Well Mode changed to Flowing
2007-01-01 Well Fluid changed to Gas
2007-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-14 Perforation 942.00 945.00 18
2000-03-22 Perforation 949.00 950.00 14
2000-03-22 Acid Treatment 942.00 950.00 0
2000-03-23 Cement Squeeze 942.00 950.00 0
2000-03-28 Perforation 942.50 944.00 18
2006-08-04 Packing Device Capped w/Cement 925.50 933.50 0
2006-08-04 Perforation 812.50 814.00 17
2006-08-04 Perforation 815.50 816.50 17
2006-08-18 Fracture 812.50 816.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 960 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 7778 0.0 0.0 0.0
2009 8113 0.0 0.0 0.0
2010 7872 0.0 0.0 0.0
2011 7464 0.0 0.0 0.0
2012 8184 0.0 0.0 0.0
2013 6264 0.0 0.0 0.0
2014 6792 0.0 0.0 0.0
2015 7677 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8501 0.0 0.0 0.0
2018 6023 0.0 0.0 0.0
2019 7850 0.0 0.0 0.0
2020 1848 0.0 0.0 0.0

For data sources see[5]

References