X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394100805020

Well Details

Well ID: 0394100805020
Loading map...
Location: 02/05-08-039-10W4/0
Location Alias: 02/05-08-39-10 W4M
Location Alias 2: 02/05-08-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 08
County/Municipality: County of Paintearth No. 18
Well Name: KARVE 102 HZ PROVOST 5-8-39-10
Operator Name: Karve Energy Inc.
License Number: 0490693
License Date: 2018-08-30
License Status: Issued
Spud Date: 2018-09-28
Final Drill Date: 2018-09-30
Well Total Depth: 2439.50 m
Surface Hole Latitude: 52.340119
Surface Hole Longitude: -111.394567

For data sources see[1][2]

Well History

Date Event
2018-08-30 Obtained License
2018-09-28 Surface Casing Operation Performed
2018-09-29 Direction Drilling Operation Performed - Deviate
2018-09-29 Direction Drilling Operation Performed - Horizontal
2018-09-30 Finished Drilling
2018-09-30 Well Log Performed
2018-09-30 Well Mode changed to Drilled and Cased
2018-10-01 Production Casing Operation Performed
2018-10-02 Rig Released
2018-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-01 Well Began Production
2018-11-01 Well Fluid changed to Crude Oil
2018-11-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-28 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-29 463.50 Deviate (5 - 79 degrees)
2018-09-29 1014.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-10 Multi-Stage Fracture 2380.70 2380.80 0
2018-10-10 Multi-Stage Fracture 2066.60 2066.70 0
2018-10-10 Multi-Stage Fracture 2031.70 2031.80 0
2018-10-10 Multi-Stage Fracture 1996.90 1997.00 0
2018-10-10 Multi-Stage Fracture 1962.00 1962.10 0
2018-10-10 Multi-Stage Fracture 1927.10 1927.20 0
2018-10-10 Multi-Stage Fracture 1892.20 1892.30 0
2018-10-10 Multi-Stage Fracture 1857.50 1857.60 0
2018-10-10 Multi-Stage Fracture 1822.70 1822.80 0
2018-10-10 Multi-Stage Fracture 1788.00 1788.10 0
2018-10-10 Multi-Stage Fracture 1741.80 1741.90 0
2018-10-10 Multi-Stage Fracture 2346.00 2346.10 0
2018-10-10 Multi-Stage Fracture 1718.40 1718.50 0
2018-10-10 Multi-Stage Fracture 1683.40 1683.50 0
2018-10-10 Multi-Stage Fracture 1649.40 1649.50 0
2018-10-10 Multi-Stage Fracture 1614.30 1614.40 0
2018-10-10 Multi-Stage Fracture 1590.60 1590.70 0
2018-10-10 Multi-Stage Fracture 1533.30 1533.40 0
2018-10-10 Multi-Stage Fracture 1510.70 1510.80 0
2018-10-10 Multi-Stage Fracture 1487.00 1487.10 0
2018-10-10 Multi-Stage Fracture 1440.60 1440.70 0
2018-10-10 Multi-Stage Fracture 1406.60 1406.70 0
2018-10-10 Multi-Stage Fracture 2299.70 2299.80 0
2018-10-10 Multi-Stage Fracture 1383.10 1383.20 0
2018-10-10 Multi-Stage Fracture 1336.50 1336.60 0
2018-10-11 Multi-Stage Fracture 1301.90 1302.00 0
2018-10-11 Multi-Stage Fracture 1266.80 1266.90 0
2018-10-11 Multi-Stage Fracture 1243.10 1243.20 0
2018-10-11 Multi-Stage Fracture 1208.50 1208.60 0
2018-10-11 Multi-Stage Fracture 1185.50 1185.60 0
2018-10-11 Multi-Stage Fracture 1151.10 1151.20 0
2018-10-11 Multi-Stage Fracture 1127.60 1127.70 0
2018-10-11 Multi-Stage Fracture 1104.00 1104.10 0
2018-10-10 Multi-Stage Fracture 2276.30 2276.40 0
2018-10-11 Multi-Stage Fracture 1080.50 1080.60 0
2018-10-10 Multi-Stage Fracture 2241.30 2241.40 0
2018-10-10 Multi-Stage Fracture 2206.20 2206.30 0
2018-10-10 Multi-Stage Fracture 2159.90 2160.00 0
2018-10-10 Multi-Stage Fracture 2136.30 2136.40 0
2018-10-10 Multi-Stage Fracture 2101.30 2101.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-10 2018-10-11 830 1,564 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 75.2591 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 23.8651 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0104 N/A
Methyl Alcohol 67-56-1 100 0.0104 N/A
Non-Hazardous Ingredients Not Available 100 0.0104 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0705 N/A
Sodium chloride 7647-14-5 100 0.0705 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1037 N/A
Non-Hazardous Ingredients Not Available 100 0.1037 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1114 N/A
Water 7732-18-5 100 0.1114 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0504 N/A
Non-Hazardous Ingredients Not Available 100 0.0504 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0504 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3887 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3887 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.1403 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.1403 N/A
Methanol 67-56-1 100 0.1403 N/A
Monoethanolamine 141-43-5 100 0.1403 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.1403 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.1403 N/A
Water 7732-18-5 100 0.1403 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-06 2018-10-06 Municipal Water 532
2018-10-06 2018-10-06 Municipal Water 770
2018-10-06 2018-10-06 Central Water Distribution Facility 221
2018-10-06 2018-10-06 Central Water Distribution Facility 126
2018-10-06 2018-10-06 Central Water Distribution Facility 14
2018-10-06 2018-10-06 Central Water Distribution Facility 105

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1341 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-02 No Incident Encountered 0.00 0.00
2018-10-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References