X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394100904002

Well Details

Well ID: 0394100904002
Loading map...
Location: 00/04-09-039-10W4/2
Location Alias: 00/04-09-39-10 W4M
Location Alias 2: 00/04-09-039-10 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 09
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 4-9-39-10
Operator Name: Karve Energy Inc.
License Number: 0152069
License Date: 1992-03-23
License Status: Amended
Spud Date: 1992-05-06
Final Drill Date: 1992-05-09
Well Total Depth: 1006.00 m
Surface Hole Latitude: 52.334476
Surface Hole Longitude: -111.395450

For data sources see[1][2]

Well History

Date Event
1992-03-23 Obtained License
1992-05-07 Surface Casing Operation Performed
1992-05-09 Finished Drilling
1992-05-09 Well Log Performed
1992-05-09 Well Mode changed to Drilled and Cased
1992-05-10 Production Casing Operation Performed
1992-05-10 Rig Released
1992-06-02 Perforation Treatment Performed - Jet Perforation
1992-06-02 Well Log Performed
1992-06-03 Well Log Performed
1992-06-04 Perforation Treatment Performed - Fractured
1992-06-04 Well Log Performed
1995-05-10 Perforation Treatment Performed - Jet Perforation
1995-05-10 Well Log Performed
1997-12-09 Perforation Treatment Performed - Fractured
1997-12-09 Well Log Performed
1999-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-14 Perforation Treatment Performed - Jet Perforation
1999-01-14 Plug Back Performed
1999-01-14 Well Log Performed
1999-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-15 Plug Back Performed
1999-01-15 Well Log Performed
1999-01-16 Perforation Treatment Performed - Jet Perforation
1999-01-16 Well Log Performed
1999-01-16 Well Mode changed to Drilled and Cased
1999-02-04 Perforation Treatment Performed - Fractured
1999-04-28 Well Began Production
1999-04-28 Well Fluid changed to Gas
1999-04-28 Well Mode changed to Flowing
2011-04-01 Well Fluid changed to Gas
2011-04-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-02 Perforation 959.00 961.00 13
1999-01-16 Perforation 818.00 820.00 17
1999-02-04 Fracture 818.00 820.00 0
1992-06-02 Perforation 962.00 963.00 13
1992-06-04 Fracture 959.00 963.00 0
1995-05-10 Perforation 970.50 972.00 36
1997-12-09 Fracture 959.00 972.00 0
1999-01-14 Packing Device Capped w/Cement 942.00 950.00 0
1999-01-14 Perforation 931.00 932.00 17
1999-01-14 Perforation 933.00 934.00 17
1999-01-15 Packing Device Capped w/Cement 917.00 925.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5600 0.0 0.0 0.0
2000 8137 0.0 0.0 0.0
2001 8401 0.0 0.0 0.0
2002 6262 0.0 0.0 0.0
2003 6587 0.0 0.0 0.0
2004 8345 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 7368 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 6864 0.0 0.0 0.0
2014 7080 0.0 0.0 0.0
2015 8421 0.0 0.0 0.0
2016 8327 0.0 0.0 0.0
2017 8549 0.0 0.0 0.0
2018 6023 0.0 0.0 0.0
2019 6392 0.0 0.0 0.0

For data sources see[5]

References