X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394111306000

Well Details

Well ID: 0394111306000
Loading map...
Location: 00/06-13-039-11W4/0
Location Alias: 00/06-13-39-11 W4M
Location Alias 2: 00/06-13-039-11 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 11
Section: 13
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 6-13-39-11
Operator Name: Karve Energy Inc.
License Number: 0409320
License Date: 2009-02-19
License Status: Suspension
Spud Date: 2009-02-24
Final Drill Date: 2009-02-26
Well Total Depth: 1040.00 m
Surface Hole Latitude: 52.353152
Surface Hole Longitude: -111.457197

For data sources see[1][2]

Well History

Date Event
2009-01-26 Well Log Performed
2009-02-19 Obtained License
2009-02-24 Surface Casing Operation Performed
2009-02-26 Finished Drilling
2009-02-26 Well Log Performed
2009-02-26 Well Mode changed to Drilled and Cased
2009-02-27 Production Casing Operation Performed
2009-02-27 Rig Released
2009-03-15 Well Log Performed
2009-03-16 Perforation Treatment Performed - Jet Perforation
2009-03-17 Well Log Performed
2009-03-18 Perforation Treatment Performed - Jet Perforation
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2009-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-06 Plug Back Performed
2009-10-06 Well Fluid changed to Gas
2009-10-06 Well Mode changed to Abandoned Zone
2010-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-03 Perforation Treatment Performed - Jet Perforation
2010-09-03 Plug Back Performed
2010-09-04 Well Log Performed
2010-09-24 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-16 Perforation 966.50 969.20 17
2010-09-24 Fracture 600.00 735.00 0
2009-03-18 Perforation 898.00 902.00 17
2009-03-18 Perforation 907.50 912.00 17
2009-10-06 Packing Device Capped w/Cement 947.50 955.50 0
2010-09-03 Packing Device Capped w/Cement 879.00 887.00 0
2010-09-03 Perforation 600.00 606.00 20
2010-09-03 Perforation 638.00 644.00 20
2010-09-03 Perforation 711.00 717.00 20
2010-09-03 Perforation 729.00 735.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 2952 0.0 0.0 0.0

For data sources see[5]

References