X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394111309002

Well Details

Well ID: 0394111309002
Loading map...
Location: 00/09-13-039-11W4/2
Location Alias: 00/09-13-39-11 W4M
Location Alias 2: 00/09-13-039-11 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 11
Section: 13
County/Municipality: County of Paintearth No. 18
Well Name: ACL 9B PROVOST 9-13-39-11
Operator Name: Karve Energy Inc.
License Number: 0175589
License Date: 1995-02-01
License Status: Issued
Spud Date: 1995-02-26
Final Drill Date: 1995-02-28
Well Total Depth: 1023.00 m
Surface Hole Latitude: 52.355279
Surface Hole Longitude: -111.450288

For data sources see[1][2]

Well History

Date Event
1995-02-01 Obtained License
1995-02-26 Surface Casing Operation Performed
1995-02-26 Well Log Performed
1995-02-28 Finished Drilling
1995-02-28 Well Mode changed to Drilled and Cased
1995-03-01 Production Casing Operation Performed
1995-03-01 Rig Released
1995-03-01 Well Log Performed
1995-06-13 Perforation Treatment Performed - Jet Perforation
1995-06-13 Well Log Performed
1995-07-18 Perforation Treatment Performed - Jet Perforation
1995-07-18 Well Log Performed
1995-11-01 Well Began Production
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Mode changed to Flowing
2000-04-26 Well Log Performed
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Suspended
2005-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-13 Perforation Treatment Performed - Jet Perforation
2005-12-13 Plug Back Performed
2005-12-13 Well Fluid changed to Gas
2005-12-13 Well Log Performed
2005-12-13 Well Mode changed to Abandoned Zone
2005-12-14 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-13 Perforation 963.00 966.00 13
1995-07-18 Perforation 936.00 937.00 13
2005-12-13 Packing Device Capped w/Cement 949.00 957.00 0
2005-12-13 Packing Device Capped w/Cement 924.00 932.00 0
2005-12-13 Perforation 813.00 816.00 17
2005-12-14 Fracture 813.00 816.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1426 0.0 0.0 0.0
1996 5753 0.0 0.0 0.0
1997 5123 0.0 0.0 0.0
1998 8571 0.0 0.0 0.0
1999 8461 0.0 0.0 0.0
2000 2836 0.0 0.0 0.0

For data sources see[5]

References