X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394111404002

Well Details

Well ID: 0394111404002
Loading map...
Location: 00/04-14-039-11W4/2
Location Alias: 00/04-14-39-11 W4M
Location Alias 2: 00/04-14-039-11 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 11
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 4-14-39-11
Operator Name: Karve Energy Inc.
License Number: 0157856
License Date: 1993-04-20
License Status: Issued
Spud Date: 1993-05-28
Final Drill Date: 1993-05-31
Well Total Depth: 1015.00 m
Surface Hole Latitude: 52.347481
Surface Hole Longitude: -111.491333

For data sources see[1][2]

Well History

Date Event
1993-04-20 Obtained License
1993-05-29 Surface Casing Operation Performed
1993-05-31 Drill Stem Test Performed
1993-05-31 Finished Drilling
1993-05-31 Well Log Performed
1993-05-31 Well Mode changed to Drilled and Cased
1993-06-01 Production Casing Operation Performed
1993-06-01 Rig Released
1993-06-17 Perforation Treatment Performed - Jet Perforation
1994-05-16 Perforation Treatment Performed - Jet Perforation
1994-05-17 Perforation Treatment Performed - Cement Squeeze
1994-05-17 Perforation Treatment Performed - Jet Perforation
1994-05-19 Perforation Treatment Performed - Jet Perforation
1994-05-24 Perforation Treatment Performed - Jet Perforation
2001-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-11 Plug Back Performed
2001-03-11 Well Log Performed
2001-03-12 Perforation Treatment Performed - Jet Perforation
2001-03-12 Well Log Performed
2001-03-12 Well Mode changed to Drilled and Cased
2001-04-29 Perforation Treatment Performed - Fractured
2001-09-11 Well Began Production
2001-09-11 Well Fluid changed to Gas
2001-09-11 Well Mode changed to Flowing
2003-08-01 Well Fluid changed to Gas
2003-08-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-17 Perforation 949.50 950.30 13
1994-05-16 Perforation 949.50 952.00 13
1994-05-17 Perforation 955.00 956.00 13
1994-05-17 Cement Squeeze 949.50 956.00 0
1994-05-19 Perforation 949.50 950.30 13
1994-05-24 Perforation 951.00 952.00 13
2001-03-11 Packing Device Capped w/Cement 933.00 941.00 0
2001-03-12 Perforation 811.00 814.00 17
2001-04-29 Fracture 811.00 814.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2346 0.0 0.0 0.0
2002 7166 0.0 0.0 0.0
2003 8537 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8471 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8541 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8549 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 5655 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[5]

References