X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394113612000

Well Details

Well ID: 0394113612000
Loading map...
Location: 00/12-36-039-11W4/0
Location Alias: 00/12-36-39-11 W4M
Location Alias 2: 00/12-36-039-11 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 11
Section: 36
County/Municipality: Flagstaff County
Well Name: ACL PROVOST 12-36-39-11
Operator Name: Karve Energy Inc.
License Number: 0022608
License Date: 1962-06-18
License Status: Suspension
Spud Date: 1962-06-23
Final Drill Date: 1962-07-01
Well Total Depth: 980.80 m
Surface Hole Latitude: 52.399296
Surface Hole Longitude: -111.465115

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-18 Obtained License
1962-07-01 Finished Drilling
1962-07-03 Drill Stem Test Performed
1962-07-03 Production Casing Operation Performed
1962-07-04 Perforation Treatment Performed - Jet Perforation
1962-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-07 Perforation Treatment Performed - Cement Squeeze
1962-07-12 Perforation Treatment Performed - Jet Perforation
1962-07-20 Well Mode changed to Drilled and Cased
1969-12-07 Well Began Production
1969-12-07 Well Fluid changed to Gas
1969-12-07 Well Mode changed to Flowing
1974-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-07-04 Perforation Treatment Performed - Jet Perforation
1974-07-04 Well Fluid changed to Gas
1974-07-04 Well Mode changed to Abandoned Zone
1974-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-17 Perforation Treatment Performed - Jet Perforation
1987-03-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-07-04 Perforation 891.50 892.50 13
1987-03-18 Fracture 749.80 754.70 0
1962-07-05 Acid Treatment 891.50 892.50 0
1962-07-07 Cement Squeeze 891.50 892.50 0
1962-07-12 Perforation 874.20 877.20 13
1974-07-04 Packing Device Capped w/Cement 868.70 868.70 0
1974-07-04 Perforation 749.80 751.30 7
1974-07-06 Acid Treatment 749.80 751.30 0
1987-03-17 Perforation 749.80 752.20 13
1987-03-17 Perforation 753.50 754.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1969 600 0.0 0.0 0.0
1970 8383 0.0 0.0 0.0
1971 6990 0.0 0.0 0.0
1972 8631 0.0 0.0 0.0
1973 6509 0.0 0.0 0.0
1974 2562 0.0 0.0 0.0

For data sources see[5]

References