X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394120313000

Well Details

Well ID: 0394120313000
Loading map...
Location: 00/13-03-039-12W4/0
Location Alias: 00/13-03-39-12 W4M
Location Alias 2: 00/13-03-039-12 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 12
Section: 03
County/Municipality: County of Paintearth No. 18
Well Name: KARVE HZ PROVOST 13-3-39-12
Operator Name: Karve Energy Inc.
License Number: 0490445
License Date: 2018-08-14
License Status: Issued
Spud Date: 2018-08-28
Final Drill Date: 2018-08-31
Well Total Depth: 2409.00 m
Surface Hole Latitude: 52.316548
Surface Hole Longitude: -111.661697

For data sources see[1][2]

Well History

Date Event
2018-08-14 Obtained License
2018-08-29 Direction Drilling Operation Performed - Deviate
2018-08-29 Surface Casing Operation Performed
2018-08-30 Direction Drilling Operation Performed - Horizontal
2018-08-31 Finished Drilling
2018-08-31 Well Log Performed
2018-08-31 Well Mode changed to Drilled and Cased
2018-09-01 Production Casing Operation Performed
2018-09-01 Rig Released
2018-09-06 Well Log Performed
2018-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-18 Well Began Production
2018-10-18 Well Fluid changed to Crude Oil
2018-10-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-28 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-29 482.60 Deviate (5 - 79 degrees)
2018-08-30 990.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-19 Multi-Stage Fracture 2277.90 2278.00 0
2018-09-19 Multi-Stage Fracture 1956.00 1956.10 0
2018-09-19 Multi-Stage Fracture 1920.40 1920.50 0
2018-09-19 Multi-Stage Fracture 1884.50 1884.60 0
2018-09-19 Multi-Stage Fracture 1848.70 1848.80 0
2018-09-19 Multi-Stage Fracture 1813.10 1813.20 0
2018-09-19 Multi-Stage Fracture 1777.50 1777.60 0
2018-09-19 Multi-Stage Fracture 1741.70 1741.80 0
2018-09-19 Multi-Stage Fracture 1706.00 1706.10 0
2018-09-19 Multi-Stage Fracture 1670.40 1670.50 0
2018-09-19 Multi-Stage Fracture 1634.80 1634.90 0
2018-09-19 Multi-Stage Fracture 2230.30 2230.40 0
2018-09-19 Multi-Stage Fracture 1599.10 1599.20 0
2018-09-19 Multi-Stage Fracture 1563.30 1563.40 0
2018-09-19 Multi-Stage Fracture 1527.70 1527.80 0
2018-09-19 Multi-Stage Fracture 1491.80 1491.90 0
2018-09-19 Multi-Stage Fracture 1456.10 1456.20 0
2018-09-19 Multi-Stage Fracture 1432.10 1432.20 0
2018-09-19 Multi-Stage Fracture 1408.10 1408.20 0
2018-09-19 Multi-Stage Fracture 1384.30 1384.40 0
2018-09-19 Multi-Stage Fracture 1360.30 1360.40 0
2018-09-19 Multi-Stage Fracture 1336.40 1336.50 0
2018-09-19 Multi-Stage Fracture 2206.20 2206.30 0
2018-09-19 Multi-Stage Fracture 1312.50 1312.60 0
2018-09-19 Multi-Stage Fracture 1288.60 1288.70 0
2018-09-19 Multi-Stage Fracture 1264.50 1264.60 0
2018-09-19 Multi-Stage Fracture 1240.40 1240.50 0
2018-09-19 Multi-Stage Fracture 1216.40 1216.50 0
2018-09-19 Multi-Stage Fracture 1192.40 1192.50 0
2018-09-19 Multi-Stage Fracture 1168.40 1168.50 0
2018-09-19 Multi-Stage Fracture 1144.30 1144.40 0
2018-09-19 Multi-Stage Fracture 1120.40 1120.50 0
2018-09-19 Multi-Stage Fracture 1096.60 1096.70 0
2018-09-19 Multi-Stage Fracture 2170.40 2170.50 0
2018-09-19 Multi-Stage Fracture 1072.60 1072.70 0
2018-09-19 Multi-Stage Fracture 2146.50 2146.60 0
2018-09-19 Multi-Stage Fracture 2099.00 2099.10 0
2018-09-19 Multi-Stage Fracture 2063.30 2063.40 0
2018-09-19 Multi-Stage Fracture 2027.50 2027.60 0
2018-09-19 Multi-Stage Fracture 1991.70 1991.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-19 2018-09-19 839 1,465 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 72.8587 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 26.289 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0111 N/A
Methyl Alcohol 67-56-1 100 0.0111 N/A
Non-Hazardous Ingredients Not Available 100 0.0111 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.069 N/A
Sodium chloride 7647-14-5 100 0.069 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1023 N/A
Non-Hazardous Ingredients Not Available 100 0.1023 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1086 N/A
Water 7732-18-5 100 0.1086 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0489 N/A
Non-Hazardous Ingredients Not Available 100 0.0489 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0489 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3842 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3842 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.1377 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.1377 N/A
Methanol 67-56-1 100 0.1377 N/A
Monoethanolamine 141-43-5 100 0.1377 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.1377 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.1377 N/A
Water 7732-18-5 100 0.1377 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-05 2018-09-05 Municipal Water 462
2018-09-05 2018-09-05 Municipal Water 998
2018-09-05 2018-09-05 Central Water Distribution Facility 215
2018-09-05 2018-09-05 Central Water Distribution Facility 154

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1800 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-01 No Incident Encountered 0.00 0.00
2018-10-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References