If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394133108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.407096,"lon":-111.857845,"icon":""}]} |
Location: 00/08-31-039-13W4/0 | |
Location Alias: 00/08-31-39-13 W4M | |
Location Alias 2: 00/08-31-039-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 13 | |
Section: 31 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: KARVE PROVOST 8-31-39-13 | |
Operator Name: Karve Energy Inc. | |
License Number: 0420268 | |
License Date: 2010-05-05 | |
License Status: Abandoned | |
Spud Date: 2010-06-14 | |
Final Drill Date: 2010-06-21 | |
Well Total Depth: 2222.00 m | |
Surface Hole Latitude: 52.407096 | |
Surface Hole Longitude: -111.857845 |
Date | Event |
---|---|
2010-05-05 | Obtained License |
2010-06-15 | Surface Casing Operation Performed |
2010-06-15 | Well Log Performed |
2010-06-16 | Direction Drilling Operation Performed - Horizontal |
2010-06-17 | Well Log Performed |
2010-06-18 | Intermediate Casing Operation Performed |
2010-06-18 | Well Log Performed |
2010-06-21 | Finished Drilling |
2010-06-21 | Well Log Performed |
2010-06-21 | Well Mode changed to Drilled and Cased |
2010-06-22 | Liner Casing Operation Performed |
2010-06-22 | Perforation Treatment Performed - Open-Hole Completion |
2010-06-23 | Rig Released |
2010-06-26 | Well Log Performed |
2010-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-08-01 | Well Began Production |
2010-08-01 | Well Fluid changed to Gas |
2010-08-01 | Well Mode changed to Flowing |
2015-05-01 | Well Fluid changed to Gas |
2015-05-01 | Well Mode changed to Suspended |
2015-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-10-02 | Plug Back Performed |
2015-10-02 | Well Fluid changed to Gas |
2015-10-02 | Well Mode changed to Abandoned Zone |
2015-10-03 | Well Log Performed |
2015-10-07 | Perforation Treatment Performed - Jet Perforation |
2015-10-07 | Well Log Performed |
2015-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-10-08 | Perforation Treatment Performed - Cement Squeeze |
2015-10-08 | Plug Back Performed |
2015-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-10-09 | Perforation Treatment Performed - Cement Squeeze |
2015-10-09 | Perforation Treatment Performed - Jet Perforation |
2015-10-09 | Plug Back Performed |
2015-10-09 | Well Log Performed |
2015-10-13 | Perforation Treatment Performed - Jet Perforation |
2015-10-13 | Well Log Performed |
2015-10-14 | Perforation Treatment Performed - Cement Plug |
2015-10-14 | Plug Back Performed |
2015-10-16 | Well Abandoned |
2015-10-16 | Well Fluid changed to Gas |
2015-10-16 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-16 | 537.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-06-22 | Open Hole/Barefoot Completion | 1054.00 | 2222.00 | 0 |
2010-07-05 | Multi-Stage Fracture | 1139.00 | 1139.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1717.00 | 1717.10 | 0 |
2015-10-02 | Packing Device Capped w/Cement | 907.00 | 941.00 | 0 |
2015-10-07 | Perforation | 335.00 | 337.00 | 20 |
2015-10-08 | Cement Squeeze | 335.00 | 337.00 | 0 |
2015-10-08 | Packing Device Capped w/Cement | 320.00 | 333.00 | 0 |
2015-10-09 | Perforation | 230.00 | 232.00 | 20 |
2015-10-09 | Cement Squeeze | 230.00 | 232.00 | 0 |
2015-10-09 | Packing Device Capped w/Cement | 216.00 | 228.00 | 0 |
2015-10-13 | Perforation | 147.00 | 149.00 | 17 |
2010-07-05 | Multi-Stage Fracture | 2161.00 | 2161.10 | 0 |
2015-10-14 | Cement Plug | 67.00 | 165.00 | 0 |
2010-07-05 | Multi-Stage Fracture | 2061.00 | 2061.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1974.00 | 1974.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1851.00 | 1851.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1594.00 | 1594.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1471.00 | 1471.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1337.00 | 1337.10 | 0 |
2010-07-05 | Multi-Stage Fracture | 1261.00 | 1261.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2651 | 0.0 | 0.0 | 0.0 |
2011 | 7174 | 0.0 | 0.0 | 0.0 |
2012 | 7604 | 0.0 | 0.0 | 0.0 |
2013 | 6913 | 0.0 | 0.0 | 0.0 |
2014 | 1183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-07-05 | No Incident Encountered | 0.00 | 0.00 |
2015-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]