X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394150206000

Well Details

Well ID: 0394150206000
Loading map...
Location: 00/06-02-039-15W4/0
Location Alias: 00/06-02-39-15 W4M
Location Alias 2: 00/06-02-039-15 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 15
Section: 02
County/Municipality: County of Paintearth No. 18
Well Name: SENORA WESCENT HALKIRK 6-2-39-15
Operator Name: Senora Energy Corporation
License Number: 0059057
License Date: 1976-07-08
License Status: RecCertified
Spud Date: 1976-07-09
Final Drill Date: 1976-07-15
Well Total Depth: 1172.00 m
Surface Hole Latitude: 52.322213
Surface Hole Longitude: -112.060624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-08 Obtained License
1976-07-12 Drill Stem Test Performed
1976-07-15 Drill Stem Test Performed
1976-07-15 Finished Drilling
1976-07-16 Drill Stem Test Performed
1976-07-16 Production Casing Operation Performed
1976-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-17 Perforation Treatment Performed - Fractured
1976-09-17 Perforation Treatment Performed - Jet Perforation
1976-09-23 Perforation Treatment Performed - Jet Perforation
1976-10-22 Well Mode changed to Drilled and Cased
1981-12-19 Well Began Production
1981-12-19 Well Fluid changed to Gas
1981-12-19 Well Mode changed to Flowing
1989-09-07 Well Fluid changed to Gas
1989-09-07 Well Mode changed to Suspended
1990-05-25 Well Fluid changed to Gas
1990-05-25 Well Mode changed to Flowing
1992-10-23 Well Fluid changed to Gas
1992-10-23 Well Mode changed to Closed
1993-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-27 Plug Back Performed
1993-11-27 Well Fluid changed to Gas
1993-11-27 Well Mode changed to Abandoned
1993-12-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-17 Perforation 980.20 982.70 7
1976-09-17 Acid Treatment 980.20 982.70 0
1976-09-17 Fracture 980.20 982.70 0
1976-09-23 Perforation 973.50 975.10 7
1993-11-27 Packing Device Capped w/Cement 958.00 966.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 240 0.0 0.0 0.0
1982 6193 0.0 0.0 0.0
1983 7554 0.0 0.0 0.0
1984 5036 0.0 0.0 0.0
1985 4677 0.0 0.0 0.0
1986 2844 0.0 0.0 0.0
1988 2414 0.0 0.0 0.0
1989 4365 0.0 0.0 0.0
1990 5007 0.0 0.0 0.0
1991 7785 0.0 0.0 0.0
1992 2245 0.0 0.0 0.0

For data sources see[5]

References