X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394161203000

Well Details

Well ID: 0394161203000
Loading map...
Location: 00/03-12-039-16W4/0
Location Alias: 00/03-12-39-16 W4M
Location Alias 2: 00/03-12-039-16 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 16
Section: 12
County/Municipality: County of Paintearth No. 18
Well Name: ROCK RIVER RED WILLOW 3-12-39-16
Operator Name: Rock River Resources Ltd.
License Number: 0135224
License Date: 1988-07-29
License Status: Abandoned
Spud Date: 1988-08-23
Final Drill Date: 1988-08-27
Well Total Depth: 1247.00 m
Surface Hole Latitude: 52.332822
Surface Hole Longitude: -112.181021

For data sources see[1][2]

Well History

Date Event
1988-07-29 Obtained License
1988-08-24 Surface Casing Operation Performed
1988-08-27 Finished Drilling
1988-08-27 Well Log Performed
1988-08-27 Well Mode changed to Drilled and Cased
1988-08-28 Drill Stem Test Performed
1988-08-29 Production Casing Operation Performed
1988-08-29 Rig Released
1988-11-07 Well Log Performed
1988-11-09 Perforation Treatment Performed - Jet Perforation
1989-01-12 Well Began Production
1989-01-12 Well Fluid changed to Crude Oil
1989-01-12 Well Mode changed to Pumping
1993-07-15 Well Log Performed
1996-04-08 Well Log Performed
1996-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-09 Plug Back Performed
1996-04-09 Well Abandoned
1996-04-09 Well Fluid changed to Crude Oil
1996-04-09 Well Log Performed
1996-04-09 Well Mode changed to Abandoned
1996-04-10 Perforation Treatment Performed - Jet Perforation
1996-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-11 Perforation Treatment Performed - Jet Perforation
1996-04-11 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-09 Perforation 1136.30 1137.00 13
1988-11-09 Perforation 1138.00 1140.00 13
1996-04-09 Packing Device Capped w/Cement 1111.00 1119.00 0
1996-04-10 Perforation 497.00 498.00 18
1996-04-11 Acid Treatment 497.00 498.00 0
1996-04-11 Remedial Casing Cementing 497.00 498.00 0
1996-04-11 Perforation 257.00 258.00 18
1996-04-11 Acid Treatment 257.00 258.00 0
1996-04-11 Remedial Casing Cementing 257.00 258.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4057 0.0 0.0 0.0
1990 1751 0.0 0.0 0.0
1991 6152 0.0 0.0 0.0
1993 4462 0.0 0.0 0.0
1994 7618 0.0 0.0 0.0
1995 2352 0.0 0.0 0.0

For data sources see[5]

References