X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394172908000

Well Details

Well ID: 0394172908000
Loading map...
Location: 00/08-29-039-17W4/0
Location Alias: 00/08-29-39-17 W4M
Location Alias 2: 00/08-29-039-17 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 17
Section: 29
County/Municipality: County of Stettler No. 6
Well Name: ACL ET AL RED WILOW 8-29-39-17
Operator Name: Quattro Exploration and Production Ltd.
License Number: 0109733
License Date: 1984-10-05
License Status: Suspension
Spud Date: 1984-10-19
Final Drill Date: 1984-10-25
Well Total Depth: 1286.00 m
Surface Hole Latitude: 52.382316
Surface Hole Longitude: -112.409667

For data sources see[1][2]

Well History

Date Event
1984-10-05 Obtained License
1984-10-20 Surface Casing Operation Performed
1984-10-25 Finished Drilling
1984-10-25 Well Log Performed
1984-10-26 Drill Stem Test Performed
1984-10-27 Production Casing Operation Performed
1984-10-27 Rig Released
1984-10-27 Well Mode changed to Drilled and Cased
1994-07-11 Well Log Performed
1994-07-12 Perforation Treatment Performed - Jet Perforation
1994-07-12 Well Log Performed
1995-05-10 Well Began Production
1995-05-10 Well Fluid changed to Gas
1995-05-10 Well Mode changed to Flowing
1996-05-01 Well Fluid changed to Gas
1996-05-01 Well Mode changed to Suspended
1997-06-05 Well Log Performed
1998-06-01 Well Fluid changed to Gas
1998-06-01 Well Mode changed to Suspended
1998-06-07 Perforation Treatment Performed - Fractured
1998-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-24 Perforation Treatment Performed - Jet Perforation
1998-09-24 Plug Back Performed
1998-09-24 Well Fluid changed to Gas
1998-09-24 Well Log Performed
1998-09-24 Well Mode changed to Abandoned Zone
1998-11-15 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-12 Perforation 1235.00 1236.50 13
1998-06-07 Fracture 1235.00 1236.50 0
1998-09-24 Packing Device Capped w/Cement 1222.00 1230.00 0
1998-09-24 Perforation 1061.00 1064.00 18
1998-11-15 Fracture 1061.00 1064.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3555 0.0 0.0 0.0
1996 2701 0.0 0.0 0.0

For data sources see[5]

References