X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394191506000

Well Details

Well ID: 0394191506000
Loading map...
Location: 00/06-15-039-19W4/0
Location Alias: 00/06-15-39-19 W4M
Location Alias 2: 00/06-15-039-19 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 19
Section: 15
County/Municipality: County of Stettler No. 6
Well Name: TEAC LEAHST 6-15-39-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0062891
License Date: 1977-02-21
License Status: Issued
Spud Date: 1977-02-25
Final Drill Date: 1977-03-02
Well Total Depth: 1310.60 m
Surface Hole Latitude: 52.350806
Surface Hole Longitude: -112.659493

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-21 Obtained License
1977-03-02 Drill Stem Test Performed
1977-03-02 Finished Drilling
1977-03-02 Well Mode changed to Drilled and Cased
1977-03-03 Drill Stem Test Performed
1977-03-04 Drill Stem Test Performed
1977-03-04 Production Casing Operation Performed
1977-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-16 Perforation Treatment Performed - Jet Perforation
1977-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-04-18 Perforation Treatment Performed - Jet Perforation
1977-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-26 Perforation Treatment Performed - Jet Perforation
1980-10-29 Perforation Treatment Performed - Fractured
1980-10-31 Perforation Treatment Performed - Jet Perforation
1980-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-04 Perforation Treatment Performed - Fractured
1981-01-23 Well Began Production
1981-01-23 Well Fluid changed to Gas
1981-01-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-04-16 Perforation 1269.50 1270.40 13
1980-10-31 Perforation 1112.80 1114.00 13
1980-10-31 Perforation 1115.20 1115.90 13
1980-10-31 Perforation 1116.80 1117.40 13
1980-11-03 Acid Treatment 1105.50 1117.40 0
1980-11-04 Fracture 1105.50 1117.40 0
1977-04-16 Acid Treatment 1269.50 1270.40 0
1977-04-18 Packing Device Capped w/Cement 1257.30 1264.90 0
1977-04-18 Perforation 1247.90 1249.70 13
1977-04-19 Acid Treatment 1247.90 1249.70 0
1980-10-26 Perforation 1257.30 1259.10 13
1980-10-29 Fracture 1257.30 1259.10 0
1980-10-31 Perforation 1105.50 1106.40 13
1980-10-31 Perforation 1107.90 1108.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 7714 0.0 0.0 0.0
1982 6755 0.0 0.0 0.0
1983 4524 0.0 0.0 0.0
1984 6999 0.0 0.0 0.0
1985 6898 0.0 0.0 0.0
1986 6836 0.0 0.0 0.0
1987 7153 0.0 0.0 0.0
1988 7418 0.0 0.0 0.0
1989 8544 0.0 0.0 0.0
1990 8518 0.0 0.0 0.0
1991 8028 0.0 0.0 0.0
1992 2539 0.0 0.0 0.0
1993 8393 0.0 0.0 0.0
1994 8632 0.0 0.0 0.0
1995 6777 0.0 0.0 0.0
1996 8549 0.0 0.0 0.0
1997 8503 0.0 0.0 0.0
1998 8661 0.0 0.0 0.0
1999 8147 0.0 0.0 0.0
2000 8681 0.0 0.0 0.0
2001 8502 0.0 0.0 0.0
2002 8336 0.0 0.0 0.0
2003 8736 0.0 0.0 0.0
2004 8723 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8687 0.0 0.0 0.0
2007 8232 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8515 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8407 0.0 0.0 0.0
2014 2879 0.0 0.0 0.0
2015 2208 0.0 0.0 0.0
2016 5706 0.0 0.0 0.0
2017 8638 0.0 0.0 0.0
2018 5088 0.0 0.0 0.0

For data sources see[5]

References