If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394212716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.389076,"lon":-112.934251,"icon":""}]} |
Location: 00/16-27-039-21W4/0 | |
Location Alias: 00/16-27-39-21 W4M | |
Location Alias 2: 00/16-27-039-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 21 | |
Section: 27 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: CELTIC BUFFLK 16-27-39-21 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0020212 | |
License Date: 1960-12-29 | |
License Status: Abandoned | |
Spud Date: 1960-12-30 | |
Final Drill Date: 1961-01-26 | |
Well Total Depth: 1709.00 m | |
Surface Hole Latitude: 52.389076 | |
Surface Hole Longitude: -112.934251 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-12-29 | Obtained License |
1961-01-05 | Drill Stem Test Performed |
1961-01-06 | Drill Stem Test Performed |
1961-01-10 | Drill Stem Test Performed |
1961-01-11 | Drill Stem Test Performed |
1961-01-20 | Drill Stem Test Performed |
1961-01-22 | Drill Stem Test Performed |
1961-01-23 | Drill Stem Test Performed |
1961-01-25 | Drill Stem Test Performed |
1961-01-26 | Finished Drilling |
1961-01-26 | Well Mode changed to Drilled and Cased |
1961-01-28 | Production Casing Operation Performed |
1961-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-01-30 | Perforation Treatment Performed - Jet Perforation |
1961-01-30 | Well Began Production |
1961-01-30 | Well Fluid changed to Crude Oil |
1961-01-30 | Well Mode changed to Flowing |
1967-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1967-12-12 | Perforation Treatment Performed - Cement Squeeze |
1967-12-17 | Perforation Treatment Performed - Jet Perforation |
1967-12-19 | Perforation Treatment Performed - Jet Perforation |
1967-12-19 | Well Fluid changed to Crude Oil |
1967-12-19 | Well Mode changed to Flowing |
1968-06-11 | Well Began Injection |
1968-06-11 | Well Fluid changed to Gas |
1968-06-11 | Well Type changed to Injection |
1970-10-14 | Well Fluid changed to Gas |
1970-10-14 | Well Mode changed to Suspended |
1970-10-14 | Well Type changed to Injection |
1979-06-22 | Perforation Treatment Performed - Cement Squeeze |
1979-07-07 | Perforation Treatment Performed - Cement Squeeze |
1979-07-12 | Perforation Treatment Performed - Cement Squeeze |
1979-07-17 | Perforation Treatment Performed - Jet Perforation |
1979-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-25 | Well Fluid changed to Crude Oil |
1979-07-25 | Well Mode changed to Flowing |
1988-10-18 | Well Fluid changed to Crude Oil |
1988-10-18 | Well Mode changed to Pumping |
1994-05-09 | Well Log Performed |
1994-05-11 | Well Log Performed |
1994-05-13 | Perforation Treatment Performed - Cement Squeeze |
1994-05-16 | Well Log Performed |
1994-05-17 | Perforation Treatment Performed - Jet Perforation |
2001-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-09-17 | Perforation Treatment Performed - Jet Perforation |
2007-02-01 | Well Fluid changed to Crude Oil |
2007-02-01 | Well Mode changed to Suspended |
2014-10-16 | Perforation Treatment Performed - Jet Perforation |
2014-10-16 | Well Log Performed |
2014-10-18 | Perforation Treatment Performed - Cement Plug |
2014-10-18 | Perforation Treatment Performed - Cement Squeeze |
2014-10-19 | Perforation Treatment Performed - Jet Perforation |
2014-10-20 | Perforation Treatment Performed - Jet Perforation |
2014-10-20 | Well Log Performed |
2014-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-21 | Perforation Treatment Performed - Cement Plug |
2014-10-21 | Perforation Treatment Performed - Cement Squeeze |
2014-10-21 | Plug Back Performed |
2014-10-21 | Well Fluid changed to Crude Oil |
2014-10-21 | Well Mode changed to Abandoned Zone |
2014-10-22 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-01-30 | Perforation | 1681.30 | 1682.80 | 16 |
1979-07-17 | Perforation | 1672.70 | 1674.60 | 13 |
1979-07-21 | Acid Treatment | 1672.70 | 1674.60 | 0 |
1994-05-13 | Cement Squeeze | 1672.70 | 1674.60 | 0 |
1994-05-17 | Perforation | 1662.50 | 1663.50 | 18 |
1994-05-17 | Perforation | 1665.50 | 1666.50 | 18 |
2001-09-17 | Perforation | 1661.00 | 1662.00 | 14 |
2001-09-17 | Perforation | 1662.50 | 1663.50 | 14 |
2001-09-17 | Acid Treatment | 1661.00 | 1662.00 | 0 |
2001-09-17 | Acid Treatment | 1662.50 | 1663.50 | 0 |
2014-10-16 | Perforation | 410.90 | 411.90 | 17 |
1961-01-30 | Acid Treatment | 1681.30 | 1682.80 | 0 |
2014-10-16 | Perforation | 380.40 | 381.40 | 17 |
2014-10-18 | Cement Squeeze | 380.40 | 411.90 | 0 |
2014-10-18 | Cement Plug | 412.00 | 1619.00 | 0 |
2014-10-19 | Perforation | 215.00 | 216.00 | 17 |
2014-10-20 | Perforation | 346.00 | 347.00 | 17 |
2014-10-20 | Perforation | 315.00 | 316.00 | 17 |
2014-10-20 | Perforation | 305.00 | 306.00 | 17 |
2014-10-20 | Perforation | 281.00 | 282.00 | 17 |
2014-10-20 | Perforation | 245.00 | 246.00 | 17 |
2014-10-20 | Perforation | 230.00 | 231.00 | 17 |
1967-12-10 | Packing Device Capped w/Cement | 1676.40 | 1676.40 | 0 |
2014-10-21 | Cement Squeeze | 230.00 | 347.00 | 0 |
2014-10-21 | Cement Plug | 0.00 | 216.50 | 0 |
2014-10-21 | Packing Device Capped w/Cement | 183.70 | 184.00 | 0 |
1967-12-12 | Cement Squeeze | 1630.70 | 1632.20 | 0 |
1967-12-17 | Perforation | 1327.10 | 1329.50 | 13 |
1967-12-19 | Perforation | 1660.60 | 1664.20 | 13 |
1979-06-22 | Cement Squeeze | 1327.10 | 1329.50 | 0 |
1979-07-07 | Cement Squeeze | 1660.60 | 1664.20 | 0 |
1979-07-12 | Cement Squeeze | 1660.60 | 1664.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 576 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 3204 | 0.0 | 0.0 | 0.0 |
1980 | 6502 | 0.0 | 0.0 | 0.0 |
1981 | 7503 | 0.0 | 0.0 | 0.0 |
1982 | 7287 | 0.0 | 0.0 | 0.0 |
1983 | 8560 | 0.0 | 0.0 | 0.0 |
1984 | 8051 | 0.0 | 0.0 | 0.0 |
1985 | 8678 | 0.0 | 0.0 | 0.0 |
1986 | 8393 | 0.0 | 0.0 | 0.0 |
1987 | 8623 | 0.0 | 0.0 | 0.0 |
1988 | 8618 | 0.0 | 0.0 | 0.0 |
1989 | 7975 | 0.0 | 0.0 | 0.0 |
1990 | 8310 | 0.0 | 0.0 | 0.0 |
1991 | 7978 | 0.0 | 0.0 | 0.0 |
1992 | 8480 | 0.0 | 0.0 | 0.0 |
1993 | 8389 | 0.0 | 0.0 | 0.0 |
1994 | 7860 | 0.0 | 0.0 | 0.0 |
1995 | 7989 | 0.0 | 0.0 | 0.0 |
1996 | 8255 | 0.0 | 0.0 | 0.0 |
1997 | 7510 | 0.0 | 0.0 | 0.0 |
1998 | 8405 | 0.0 | 0.0 | 0.0 |
1999 | 8446 | 0.0 | 0.0 | 0.0 |
2000 | 8322 | 0.0 | 0.0 | 0.0 |
2001 | 7918 | 0.0 | 0.0 | 0.0 |
2002 | 6190 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]