X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394260503000

Well Details

Well ID: 0394260503000
Loading map...
Location: 00/03-05-039-26W4/0
Location Alias: 00/03-05-39-26 W4M
Location Alias 2: 00/03-05-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 05
County/Municipality: Red Deer County
Well Name: NALR D2A UNIT JOFFRE 3-5-39-26
Operator Name: NAL Resources Limited
License Number: 0013104
License Date: 1957-02-15
License Status: RecCertified
Spud Date: 1957-03-12
Final Drill Date: 1957-04-27
Well Total Depth: 2176.30 m
Surface Hole Latitude: 52.320001
Surface Hole Longitude: -113.713643

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-02-15 Obtained License
1957-03-23 Drill Stem Test Performed
1957-04-03 Drill Stem Test Performed
1957-04-24 Drill Stem Test Performed
1957-04-27 Finished Drilling
1957-04-27 Well Mode changed to Drilled and Cased
1957-04-29 Production Casing Operation Performed
1957-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-05-08 Perforation Treatment Performed - Jet Perforation
1957-07-05 Perforation Treatment Performed - Cement Squeeze
1957-07-07 Perforation Treatment Performed - Open-Hole Completion
1957-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-07-15 Well Began Production
1957-07-15 Well Fluid changed to Crude Oil
1957-07-15 Well Mode changed to Pumping
1972-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-04-24 Well Fluid changed to Crude Oil
1972-04-24 Well Mode changed to Pumping
1974-02-13 Perforation Treatment Performed - Cement Plug
1974-02-13 Perforation Treatment Performed - Open-Hole Completion
1975-10-01 Well Fluid changed to Crude Oil
1975-10-01 Well Mode changed to Suspended
1992-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-24 Perforation Treatment Performed - Jet Perforation
1992-06-24 Perforation Treatment Performed - Remedial Casing
1992-06-24 Plug Back Performed
1992-06-25 Well Log Performed
1992-06-27 Perforation Treatment Performed - Jet Perforation
1992-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-28 Perforation Treatment Performed - Remedial Casing
1992-06-28 Well Fluid changed to Crude Oil
1992-06-28 Well Mode changed to Abandoned
1992-09-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-08 Perforation 1573.10 1574.00 13
1992-06-24 Perforation 750.00 750.50 13
1992-06-24 Remedial Casing Cementing 750.00 750.50 0
1992-06-24 Packing Device Capped w/Cement 719.20 737.80 0
1992-06-27 Perforation 247.00 247.50 13
1992-06-28 Remedial Casing Cementing 247.00 247.50 0
1992-06-28 Packing Device Capped w/Cement 5.00 230.00 0
1957-05-08 Acid Treatment 1573.10 1574.00 0
1957-07-05 Cement Squeeze 1573.10 1574.00 0
1957-07-07 Open Hole/Barefoot Completion 2139.70 2176.30 0
1957-07-13 Acid Treatment 2139.70 2176.30 0
1972-04-21 Acid Treatment 2139.70 2176.30 0
1974-02-13 Cement Plug 2149.80 2153.70 0
1974-02-13 Open Hole/Barefoot Completion 2139.70 2149.80 0
1992-06-24 Packing Device Capped w/Cement 2116.70 2124.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1970 7905 0.0 0.0 0.0
1971 8359 0.0 0.0 0.0
1972 6381 0.0 0.0 0.0
1973 6997 0.0 0.0 0.0
1974 428 0.0 0.0 0.0
1975 2902 0.0 0.0 0.0

For data sources see[5]

References