X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395050716002

Well Details

Well ID: 0395050716002
Loading map...
Location: 00/16-07-039-05W5/2
Location Alias: 00/16-07-39-05 W5M
Location Alias 2: 00/16-07-039-05 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 05
Section: 07
County/Municipality: Clearwater County
Well Name: ANDERSON WILLGR 16-7-39-5
Operator Name: Response Energy Corporation
License Number: 0112790
License Date: 1985-01-23
License Status: Suspension
Spud Date: 1985-02-04
Final Drill Date: 1985-02-22
Well Total Depth: 2430.00 m
Surface Hole Latitude: 52.345264
Surface Hole Longitude: -114.702688

For data sources see[1][2]

Well History

Date Event
1975-03-13 Well Log Performed
1985-01-23 Obtained License
1985-02-08 Surface Casing Operation Performed
1985-02-18 Drill Stem Test Performed
1985-02-22 Finished Drilling
1985-02-22 Well Mode changed to Drilled and Cased
1985-02-23 Well Log Performed
1985-02-24 Drill Stem Test Performed
1985-02-26 Production Casing Operation Performed
1985-02-26 Rig Released
1985-03-06 Perforation Treatment Performed - Jet Perforation
1985-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-09 Perforation Treatment Performed - Fractured
1985-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-13 Perforation Treatment Performed - Jet Perforation
1985-03-13 Well Log Performed
1985-03-15 Perforation Treatment Performed - Fractured
1985-10-27 Perforation Treatment Performed - Jet Perforation
1985-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-01 Well Began Production
1985-11-01 Well Fluid changed to Crude Oil
1985-11-01 Well Mode changed to Pumping
1985-11-06 Perforation Treatment Performed - Jet Perforation
1985-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-14 Perforation Treatment Performed - Fractured
1985-11-21 Well Fluid changed to Crude Oil
1985-11-21 Well Mode changed to Pumping
1999-11-29 Perforation Treatment Performed - Cement Squeeze
1999-11-29 Perforation Treatment Performed - Jet Perforation
1999-11-29 Plug Back Performed
1999-12-01 Perforation Treatment Performed - Cement Squeeze
1999-12-01 Plug Back Performed
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Abandoned Zone
1999-12-04 Perforation Treatment Performed - Jet Perforation
1999-12-06 Perforation Treatment Performed - Fractured
2009-07-12 Perforation Treatment Performed - Jet Perforation
2009-07-13 Perforation Treatment Performed - Jet Perforation
2009-07-14 Perforation Treatment Performed - Fractured
2009-07-26 Well Fluid changed to Crude Oil
2009-07-26 Well Mode changed to Pumping
2009-07-27 Well Fluid changed to Crude Oil
2009-07-27 Well Mode changed to Pumping
2009-08-20 Perforation Treatment Performed - Jet Perforation
2009-08-21 Perforation Treatment Performed - Chemical Squeeze
2009-09-01 Perforation Treatment Performed - Fractured
2009-09-02 Perforation Treatment Performed - Jet Perforation
2009-09-04 Well Fluid changed to Crude Oil
2009-09-04 Well Mode changed to Pumping
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Suspended
2017-06-25 Well Fluid changed to Crude Oil
2017-06-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-06 Perforation 2390.00 2392.00 13
1985-10-29 Acid Treatment 2115.50 2137.00 0
1985-11-06 Perforation 2076.00 2085.00 13
1985-11-07 Acid Treatment 2076.00 2085.00 0
1985-11-14 Fracture 2076.00 2137.00 0
1999-11-29 Perforation 2201.00 2203.50 13
1999-11-29 Cement Squeeze 2201.00 2203.50 0
1999-11-29 Cement Squeeze 2115.50 2137.00 0
1999-12-01 Cement Squeeze 2076.00 2085.00 0
1999-12-04 Perforation 2367.00 2371.50 13
1999-12-06 Fracture 2367.00 2371.50 0
1985-03-07 Acid Treatment 2390.00 2392.00 0
2009-07-12 Perforation 2120.00 2122.00 6
2009-07-12 Perforation 2128.00 2130.00 6
2009-07-12 Perforation 2132.50 2134.00 6
2009-07-13 Perforation 2075.50 2080.50 6
2009-07-13 Perforation 2080.50 2085.50 6
2009-07-14 Fracture 2075.50 2085.50 0
2009-08-20 Perforation 2200.50 2203.50 17
2009-08-21 Chemical Squeeze 2200.50 2203.50 0
2009-09-01 Fracture 2200.50 2203.50 0
2009-09-02 Perforation 2092.00 2096.00 17
1985-03-09 Fracture 2390.00 2392.00 0
1985-03-13 Packing Device Capped w/Cement 2376.00 2384.00 0
1985-03-13 Perforation 2201.00 2203.50 13
1985-03-15 Fracture 2201.00 2203.50 0
1985-10-27 Perforation 2115.50 2117.50 13
1985-10-27 Perforation 2120.50 2123.50 13
1985-10-27 Perforation 2127.00 2137.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4484 0.0 0.0 0.0
1986 8353 0.0 0.0 0.0
1987 8570 0.0 0.0 0.0
1988 8700 0.0 0.0 0.0
1989 8326 0.0 0.0 0.0
1990 7683 0.0 0.0 0.0
1991 8730 0.0 0.0 0.0
1992 8728 0.0 0.0 0.0
1993 8365 0.0 0.0 0.0
1994 8655 0.0 0.0 0.0
1995 8105 0.0 0.0 0.0
1996 8713 0.0 0.0 0.0
1997 8705 0.0 0.0 0.0
1998 7871 0.0 0.0 0.0
1999 4164 0.0 0.0 0.0
2009 2833 0.0 0.0 0.0
2010 8456 0.0 0.0 0.0
2011 6609 0.0 0.0 0.0
2012 4677 0.0 0.0 0.0
2013 7689 0.0 0.0 0.0
2014 4572 0.0 0.0 0.0
2017 2784 0.0 0.0 0.0
2018 8506 0.0 0.0 0.0
2019 8437 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[5]

References