If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395051010002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/10-10-039-05W5/2 | |
Location Alias: 00/10-10-39-05 W5M | |
Location Alias 2: 00/10-10-039-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 05 | |
Section: 10 | |
County/Municipality: Clearwater County | |
Well Name: DEKALB ET AL WILLGR 10-10-39-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0105708 | |
License Date: 1984-02-02 | |
License Status: Re-Entered | |
Spud Date: 1984-02-08 | |
Final Drill Date: 1984-02-23 | |
Well Total Depth: 2425.00 m | |
Surface Hole Latitude: 52.343413 | |
Surface Hole Longitude: -114.633749 |
Date | Event |
---|---|
1984-02-02 | Obtained License |
1984-02-09 | Lost Circulation Occurred |
1984-02-23 | Finished Drilling |
1984-02-23 | Well Mode changed to Drilled and Cased |
1984-02-27 | Well Log Performed |
1984-02-28 | Well Log Performed |
1984-02-29 | Drill Stem Test Performed |
1984-03-02 | Drill Stem Test Performed |
1984-03-04 | Production Casing Operation Performed |
1984-06-05 | Well Log Performed |
1984-06-07 | Well Log Performed |
1984-06-08 | Perforation Treatment Performed - Jet Perforation |
1988-05-01 | Well Began Production |
1988-05-01 | Well Fluid changed to Crude Oil |
1988-05-01 | Well Mode changed to Flowing |
1988-05-07 | Well Log Performed |
1988-05-08 | Perforation Treatment Performed - Jet Perforation |
1988-05-11 | Perforation Treatment Performed - Fractured |
1990-03-08 | Well Fluid changed to Crude Oil |
1990-03-08 | Well Mode changed to Suspended |
1993-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-23 | Perforation Treatment Performed - Jet Perforation |
1993-06-23 | Plug Back Performed |
1993-06-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-26 | Plug Back Performed |
1994-06-07 | Perforation Treatment Performed - Jet Perforation |
1994-06-08 | Perforation Treatment Performed - Remedial Casing |
1994-06-09 | Perforation Treatment Performed - Cement Plug |
1994-06-09 | Well Fluid changed to Crude Oil |
1994-06-09 | Well Mode changed to Abandoned |
1994-06-10 | Well Fluid changed to Crude Oil |
1994-06-10 | Well Mode changed to Abandoned and Re-entered |
1994-08-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-06-08 | Perforation | 2354.00 | 2355.00 | 13 |
1988-05-08 | Perforation | 2331.50 | 2334.00 | 13 |
1988-05-11 | Fracture | 2331.50 | 2334.00 | 0 |
1993-06-23 | Packing Device Capped w/Cement | 2313.00 | 2321.00 | 0 |
1993-06-23 | Perforation | 2037.50 | 2049.00 | 13 |
1993-06-26 | Packing Device Capped w/Cement | 2022.00 | 2030.00 | 0 |
1994-06-07 | Perforation | 533.00 | 533.50 | 13 |
1994-06-08 | Remedial Casing Cementing | 533.00 | 533.50 | 0 |
1994-06-09 | Cement Plug | 56.70 | 533.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 5174 | 0.0 | 0.0 | 0.0 |
1989 | 7688 | 0.0 | 0.0 | 0.0 |
1990 | 1080 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-02-09 | Lost Circulation | 289.00 | 289.00 |
For data sources see[6]