X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404021016000

Well Details

Well ID: 0404021016000
Loading map...
Location: 00/16-10-040-02W4/0
Location Alias: 00/16-10-40-02 W4M
Location Alias 2: 00/16-10-040-02 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 02
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: KOCH COHO PROVOST 16-10-40-2
Operator Name: Koch Exploration Canada, Ltd.
License Number: 0134850
License Date: 1988-07-11
License Status: RecCertified
Spud Date: 1988-07-23
Final Drill Date: 1988-07-26
Well Total Depth: 838.00 m
Surface Hole Latitude: 52.433575
Surface Hole Longitude: -110.201420

For data sources see[1][2]

Well History

Date Event
1988-07-11 Obtained License
1988-07-24 Surface Casing Operation Performed
1988-07-26 Finished Drilling
1988-07-26 Well Log Performed
1988-07-26 Well Mode changed to Drilled and Cased
1988-07-27 Production Casing Operation Performed
1988-07-27 Rig Released
1988-09-12 Perforation Treatment Performed - Jet Perforation
1988-09-12 Well Log Performed
1988-09-13 Perforation Treatment Performed - Jet Perforation
1988-09-15 Perforation Treatment Performed - Jet Perforation
1989-02-01 Well Began Production
1989-02-01 Well Fluid changed to Crude Oil
1989-02-01 Well Mode changed to Pumping
1989-02-09 Well Log Performed
1996-04-01 Well Fluid changed to Crude Oil
1996-04-01 Well Mode changed to Suspended
1996-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-27 Plug Back Performed
1996-06-27 Well Fluid changed to Crude Oil
1996-06-27 Well Mode changed to Abandoned Zone
1996-10-24 Perforation Treatment Performed - Jet Perforation
1996-10-24 Perforation Treatment Performed - Remedial Casing
1997-05-06 Well Abandoned
1997-05-06 Well Fluid changed to Crude Oil
1997-05-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-12 Perforation 779.00 781.00 13
1988-09-13 Perforation 781.00 782.00 13
1988-09-15 Perforation 783.00 784.00 13
1996-06-27 Packing Device Capped w/Cement 757.00 765.00 0
1996-10-24 Perforation 184.20 185.20 14
1996-10-24 Remedial Casing Cementing 184.20 185.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 7763 0.0 0.0 0.0
1990 8653 0.0 0.0 0.0
1991 8709 0.0 0.0 0.0
1992 8739 0.0 0.0 0.0
1993 7740 0.0 0.0 0.0
1995 672 0.0 0.0 0.0
1996 288 0.0 0.0 0.0

For data sources see[5]

References