X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030405002

Well Details

Well ID: 0404030405002
Loading map...
Location: 00/05-04-040-03W4/2
Location Alias: 00/05-04-40-03 W4M
Location Alias 2: 00/05-04-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 04
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC PROVOST 5-4-40-3
Operator Name: West Lake Energy Corp.
License Number: 0114382
License Date: 1985-05-02
License Status: Abandoned
Spud Date: 1985-05-06
Final Drill Date: 1985-05-09
Well Total Depth: 838.00 m
Surface Hole Latitude: 52.411140
Surface Hole Longitude: -110.387231

For data sources see[1][2]

Well History

Date Event
1985-05-02 Obtained License
1985-05-07 Surface Casing Operation Performed
1985-05-09 Finished Drilling
1985-05-09 Well Mode changed to Drilled and Cased
1985-05-10 Production Casing Operation Performed
1985-05-10 Rig Released
1985-05-10 Well Log Performed
1985-05-28 Well Log Performed
1985-05-29 Perforation Treatment Performed - Jet Perforation
1985-05-29 Well Log Performed
1990-03-06 Well Log Performed
1990-03-08 Perforation Treatment Performed - Cement Squeeze
1990-03-11 Perforation Treatment Performed - Jet Perforation
2006-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-21 Plug Back Performed
2006-02-22 Perforation Treatment Performed - Jet Perforation
2006-02-22 Well Log Performed
2011-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-19 Plug Back Performed
2011-10-19 Well Mode changed to Abandoned Zone
2011-11-10 Well Abandoned
2011-11-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-29 Perforation 785.00 788.00 13
1990-03-08 Cement Squeeze 785.00 788.00 0
1990-03-11 Perforation 783.50 786.00 13
2006-02-21 Packing Device Capped w/Cement 766.80 774.80 0
2006-02-22 Perforation 743.00 744.50 17
2011-10-19 Packing Device Capped w/Cement 722.00 730.00 0

For data sources see[4]



References