X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030506C00

Well Details

Well ID: 0404030506C00
Loading map...
Location: C0/06-05-040-03W4/0
Location Alias: C0/06-05-40-03 W4M
Location Alias 2: C0/06-05-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 6C PROVOST 6-5-40-3
Operator Name: West Lake Energy Corp.
License Number: 0154092
License Date: 1992-10-16
License Status: Issued
Spud Date: 1992-10-25
Final Drill Date: 1992-10-30
Well Total Depth: 1030.00 m
Surface Hole Latitude: 52.406992
Surface Hole Longitude: -110.403775

For data sources see[1][2]

Well History

Date Event
1992-10-16 Obtained License
1992-10-25 Direction Drilling Operation Performed - Deviate
1992-10-26 Surface Casing Operation Performed
1992-10-30 Finished Drilling
1992-10-30 Well Log Performed
1992-10-30 Well Mode changed to Drilled and Cased
1992-10-31 Production Casing Operation Performed
1992-11-01 Rig Released
1992-11-04 Well Log Performed
1992-11-06 Well Log Performed
1992-11-08 Perforation Treatment Performed - Jet Perforation
1992-11-08 Well Log Performed
1992-11-09 Well Log Performed
1992-11-11 Well Began Production
1992-11-11 Well Fluid changed to Crude Oil
1992-11-11 Well Mode changed to Pumping
1992-12-11 Perforation Treatment Performed - Jet Perforation
1992-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-12 Well Log Performed
1992-12-18 Perforation Treatment Performed - Chemical Squeeze
1993-04-29 Well Log Performed
1996-04-01 Well Fluid changed to Crude Oil
1996-04-01 Well Mode changed to Suspended
2000-05-28 Well Fluid changed to Crude Oil
2000-05-28 Well Mode changed to Pumping
2000-11-08 Perforation Treatment Performed - Cement Squeeze
2000-11-14 Perforation Treatment Performed - Jet Perforation
2000-11-15 Well Log Performed
2001-03-02 Well Fluid changed to Crude Oil
2001-03-02 Well Mode changed to Suspended
2001-05-18 Well Fluid changed to Crude Oil
2001-05-18 Well Mode changed to Pumping
2001-12-27 Well Fluid changed to Crude Oil
2001-12-27 Well Mode changed to Suspended
2004-05-06 Well Fluid changed to Crude Oil
2004-05-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-10-25 41.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-08 Perforation 980.50 983.00 13
1992-12-11 Perforation 980.50 983.00 13
1992-12-12 Acid Treatment 980.50 983.00 0
1992-12-18 Chemical Squeeze 980.50 983.00 0
2000-11-08 Cement Squeeze 980.50 983.00 0
2000-11-14 Perforation 981.50 985.00 17
2000-11-14 Perforation 976.50 979.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 933 0.0 0.0 0.0
1993 5196 0.0 0.0 0.0
1994 2906 0.0 0.0 0.0
1995 6492 0.0 0.0 0.0
2000 1051 0.0 0.0 0.0
2001 3907 0.0 0.0 0.0
2004 5470 0.0 0.0 0.0
2005 8511 0.0 0.0 0.0
2006 8516 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8077 0.0 0.0 0.0
2009 8522 0.0 0.0 0.0
2010 8319 0.0 0.0 0.0
2011 8449 0.0 0.0 0.0
2012 8091 0.0 0.0 0.0
2013 8696 0.0 0.0 0.0
2014 8233 0.0 0.0 0.0
2015 8705 0.0 0.0 0.0
2016 8654 0.0 0.0 0.0
2017 8543 0.0 0.0 0.0
2018 8521 0.0 0.0 0.0
2019 5312 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[6]

References