X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030509A00

Well Details

Well ID: 0404030509A00
Loading map...
Location: A0/09-05-040-03W4/0
Location Alias: A0/09-05-40-03 W4M
Location Alias 2: A0/09-05-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 9A PROVOST 9-5-40-3
Operator Name: West Lake Energy Corp.
License Number: 0149259
License Date: 1991-06-25
License Status: Suspension
Spud Date: 1991-08-02
Final Drill Date: 1991-08-04
Well Total Depth: 872.00 m
Surface Hole Latitude: 52.415626
Surface Hole Longitude: -110.392172

For data sources see[1][2]

Well History

Date Event
1991-06-25 Obtained License
1991-08-02 Direction Drilling Operation Performed - Deviate
1991-08-02 Surface Casing Operation Performed
1991-08-04 Finished Drilling
1991-08-04 Well Log Performed
1991-08-04 Well Mode changed to Drilled and Cased
1991-08-05 Production Casing Operation Performed
1991-08-05 Rig Released
1991-08-14 Well Log Performed
1991-09-06 Well Log Performed
1991-09-12 Perforation Treatment Performed - Jet Perforation
1991-11-28 Well Began Production
1991-11-28 Well Fluid changed to Crude Oil
1991-11-28 Well Mode changed to Pumping
1996-11-23 Well Log Performed
2001-04-01 Well Fluid changed to Crude Oil
2001-04-01 Well Mode changed to Suspended
2007-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-21 Plug Back Performed
2007-01-21 Well Fluid changed to Crude Oil
2007-01-21 Well Mode changed to Abandoned Zone
2007-01-26 Perforation Treatment Performed - Jet Perforation
2007-01-26 Well Log Performed
2007-02-03 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-08-02 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-09-12 Perforation 825.50 827.50 13
2007-01-21 Packing Device Capped w/Cement 810.00 818.00 0
2007-01-26 Perforation 782.00 784.00 20
2007-02-03 Fracture 782.00 784.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 744 0.0 0.0 0.0
1992 8123 0.0 0.0 0.0
1993 6953 0.0 0.0 0.0
1994 7145 0.0 0.0 0.0
1995 8144 0.0 0.0 0.0
1996 6525 0.0 0.0 0.0
1997 7727 0.0 0.0 0.0
1998 8454 0.0 0.0 0.0
1999 8381 0.0 0.0 0.0
2000 789 0.0 0.0 0.0

For data sources see[6]

References