X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030515D02

Well Details

Well ID: 0404030515D02
Loading map...
Location: D0/15-05-040-03W4/2
Location Alias: D0/15-05-40-03 W4M
Location Alias 2: D0/15-05-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 15D PROVOST 15-5-40-3
Operator Name: West Lake Energy Corp.
License Number: 0149256
License Date: 1991-06-25
License Status: Suspension
Spud Date: 1991-07-17
Final Drill Date: 1991-07-19
Well Total Depth: 915.00 m
Surface Hole Latitude: 52.415626
Surface Hole Longitude: -110.392539

For data sources see[1][2]

Well History

Date Event
1991-06-25 Obtained License
1991-07-17 Direction Drilling Operation Performed - Deviate
1991-07-17 Surface Casing Operation Performed
1991-07-18 Well Log Performed
1991-07-19 Finished Drilling
1991-07-19 Well Mode changed to Drilled and Cased
1991-07-20 Production Casing Operation Performed
1991-07-20 Rig Released
1991-07-20 Well Log Performed
1991-09-05 Perforation Treatment Performed - Jet Perforation
1991-09-05 Well Log Performed
1996-11-02 Perforation Treatment Performed - Cement Squeeze
1996-11-10 Perforation Treatment Performed - Jet Perforation
1996-11-10 Well Log Performed
1996-11-11 Perforation Treatment Performed - Jet Perforation
1996-11-11 Well Log Performed
2007-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-23 Plug Back Performed
2007-01-26 Perforation Treatment Performed - Jet Perforation
2007-01-26 Well Log Performed
2007-02-03 Perforation Treatment Performed - Fractured
2007-03-20 Well Began Production
2007-03-20 Well Fluid changed to Crude Oil
2007-03-20 Well Mode changed to Pumping
2010-03-01 Well Fluid changed to Crude Oil
2010-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-07-17 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-09-05 Perforation 863.00 865.00 13
1996-11-02 Cement Squeeze 863.00 865.00 0
1996-11-10 Perforation 863.00 864.00 17
1996-11-11 Perforation 863.00 864.80 17
2007-01-23 Packing Device Capped w/Cement 849.50 857.50 0
2007-01-26 Perforation 817.00 819.00 20
2007-02-03 Fracture 817.00 819.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 6863 0.0 0.0 0.0
2008 8193 0.0 0.0 0.0

For data sources see[6]

References