X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030904A30

Well Details

Well ID: 0404030904A30
Loading map...
Location: A3/04-09-040-03W4/0
Location Alias: A3/04-09-40-03 W4M
Location Alias 2: A3/04-09-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 09
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 4A2 PROVOST 4-9-40-3
Operator Name: West Lake Energy Corp.
License Number: 0199079
License Date: 1997-03-07
License Status: Suspension
Spud Date: 1997-03-20
Final Drill Date: 1997-05-19
Well Total Depth: 1000.00 m
Surface Hole Latitude: 52.422647
Surface Hole Longitude: -110.381045

For data sources see[1][2]

Well History

Date Event
1997-03-07 Obtained License
1997-03-20 Surface Casing Operation Performed
1997-05-14 Direction Drilling Operation Performed - Deviate
1997-05-14 Well Log Performed
1997-05-17 Production Casing Operation Performed
1997-05-17 Well Log Performed
1997-05-19 Finished Drilling
1997-05-19 Lost Circulation Occurred
1997-05-19 Perforation Treatment Performed - Open-Hole Completion
1997-05-19 Rig Released
1997-05-19 Well Mode changed to Drilled and Cased
1997-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-07 Perforation Treatment Performed - Jet Perforation
1997-08-07 Well Log Performed
1997-08-08 Well Log Performed
1997-08-15 Well Began Production
1997-08-15 Well Fluid changed to Crude Oil
1997-08-15 Well Mode changed to Pumping
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-14 97.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-19 Open Hole/Barefoot Completion 900.00 1000.00 0
1997-08-07 Packing Device Capped w/Cement 878.00 884.00 0
1997-08-07 Perforation 850.50 855.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2958 0.0 0.0 0.0
1998 8677 0.0 0.0 0.0
1999 8692 0.0 0.0 0.0
2000 8702 0.0 0.0 0.0
2001 7214 0.0 0.0 0.0
2002 8649 0.0 0.0 0.0
2003 8540 0.0 0.0 0.0
2004 8066 0.0 0.0 0.0
2005 8376 0.0 0.0 0.0
2006 7715 0.0 0.0 0.0
2007 8729 0.0 0.0 0.0
2008 7694 0.0 0.0 0.0
2009 7929 0.0 0.0 0.0
2010 8757 0.0 0.0 0.0
2011 8492 0.0 0.0 0.0
2012 5773 0.0 0.0 0.0
2013 1886 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-05-19 Lost Circulation 950.00 1000.00

For data sources see[7]

References