X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404030913B00

Well Details

Well ID: 0404030913B00
Loading map...
Location: B0/13-09-040-03W4/0
Location Alias: B0/13-09-40-03 W4M
Location Alias 2: B0/13-09-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 09
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 13B PROVOST 13-9-40-3
Operator Name: West Lake Energy Corp.
License Number: 0137622
License Date: 1988-12-12
License Status: Suspension
Spud Date: 1988-12-18
Final Drill Date: 1988-12-20
Well Total Depth: 857.00 m
Surface Hole Latitude: 52.432891
Surface Hole Longitude: -110.387575

For data sources see[1][2]

Well History

Date Event
1988-12-12 Obtained License
1988-12-19 Direction Drilling Operation Performed - Deviate
1988-12-19 Surface Casing Operation Performed
1988-12-20 Finished Drilling
1988-12-20 Well Log Performed
1988-12-21 Production Casing Operation Performed
1988-12-21 Rig Released
1988-12-21 Well Log Performed
1988-12-21 Well Mode changed to Drilled and Cased
1989-02-10 Well Log Performed
1989-02-11 Well Log Performed
1989-02-12 Perforation Treatment Performed - Jet Perforation
1989-02-12 Well Log Performed
1989-03-16 Well Began Production
1989-03-16 Well Fluid changed to Crude Oil
1989-03-16 Well Mode changed to Pumping
1989-08-08 Perforation Treatment Performed - Jet Perforation
1989-08-08 Well Log Performed
1990-11-20 Perforation Treatment Performed - Cement Squeeze
1990-11-24 Perforation Treatment Performed - Jet Perforation
1990-11-24 Well Log Performed
2004-06-22 Perforation Treatment Performed - Jet Perforation
2004-06-22 Well Log Performed
2004-08-01 Well Fluid changed to Crude Oil
2004-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-12-19 182.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-12 Perforation 812.00 816.50 13
1989-08-08 Perforation 816.50 820.50 13
1990-11-20 Cement Squeeze 812.00 820.50 0
1990-11-24 Perforation 814.50 819.00 13
2004-06-22 Perforation 809.00 811.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 6079 0.0 0.0 0.0
1990 7733 0.0 0.0 0.0
1991 8180 0.0 0.0 0.0
1992 8332 0.0 0.0 0.0
1993 7048 0.0 0.0 0.0
1994 7227 0.0 0.0 0.0
1995 7097 0.0 0.0 0.0
1996 7104 0.0 0.0 0.0
1997 8044 0.0 0.0 0.0
1998 8390 0.0 0.0 0.0
1999 8396 0.0 0.0 0.0
2000 8521 0.0 0.0 0.0
2001 8629 0.0 0.0 0.0
2002 8550 0.0 0.0 0.0
2003 6932 0.0 0.0 0.0
2004 239 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References