X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031605020

Well Details

Well ID: 0404031605020
Loading map...
Location: 02/05-16-040-03W4/0
Location Alias: 02/05-16-40-03 W4M
Location Alias 2: 02/05-16-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 12A PROVOST 5-16-40-3
Operator Name: West Lake Energy Corp.
License Number: 0169078
License Date: 1994-07-28
License Status: Suspension
Spud Date: 1994-08-17
Final Drill Date: 1994-08-19
Well Total Depth: 958.00 m
Surface Hole Latitude: 52.443996
Surface Hole Longitude: -110.379358

For data sources see[1][2]

Well History

Date Event
1994-07-28 Obtained License
1994-08-17 Direction Drilling Operation Performed - Deviate
1994-08-17 Surface Casing Operation Performed
1994-08-19 Finished Drilling
1994-08-19 Well Log Performed
1994-08-19 Well Mode changed to Drilled and Cased
1994-08-20 Production Casing Operation Performed
1994-08-20 Rig Released
1994-09-25 Perforation Treatment Performed - Jet Perforation
1994-09-25 Well Log Performed
1994-10-08 Well Began Production
1994-10-08 Well Fluid changed to Crude Oil
1994-10-08 Well Mode changed to Pumping
1996-09-05 Perforation Treatment Performed - Cement Squeeze
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-09 Well Log Performed
2003-05-22 Well Log Performed
2003-06-06 Well Log Performed
2003-06-11 Well Log Performed
2003-07-11 Perforation Treatment Performed - Cement Squeeze
2003-07-18 Perforation Treatment Performed - Jet Perforation
2003-07-19 Well Log Performed
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-08-17 120.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-25 Perforation 903.50 910.10 17
1996-09-05 Cement Squeeze 903.50 910.10 0
1996-09-09 Perforation 903.50 910.20 17
2003-07-11 Cement Squeeze 903.50 910.00 0
2003-07-18 Perforation 911.30 914.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1428 0.0 0.0 0.0
1995 7043 0.0 0.0 0.0
1996 6227 0.0 0.0 0.0
1997 7154 0.0 0.0 0.0
1998 8445 0.0 0.0 0.0
1999 8469 0.0 0.0 0.0
2000 8548 0.0 0.0 0.0
2001 8628 0.0 0.0 0.0
2002 8626 0.0 0.0 0.0
2003 4002 0.0 0.0 0.0
2004 8440 0.0 0.0 0.0
2005 8343 0.0 0.0 0.0
2006 7572 0.0 0.0 0.0
2007 4938 0.0 0.0 0.0
2008 8705 0.0 0.0 0.0
2009 8639 0.0 0.0 0.0
2010 8757 0.0 0.0 0.0
2011 7038 0.0 0.0 0.0

For data sources see[6]

References