X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031706000

Well Details

Well ID: 0404031706000
Loading map...
Location: 00/06-17-040-03W4/0
Location Alias: 00/06-17-40-03 W4M
Location Alias 2: 00/06-17-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 17
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC PROVOST 6-17-40-3
Operator Name: West Lake Energy Corp.
License Number: 0261363
License Date: 2001-11-05
License Status: Abandoned
Spud Date: 2002-02-20
Final Drill Date: 2002-02-21
Well Total Depth: 915.00 m
Surface Hole Latitude: 52.441631
Surface Hole Longitude: -110.403240

For data sources see[1][2]

Well History

Date Event
2001-11-05 Obtained License
2002-02-20 Direction Drilling Operation Performed - Deviate
2002-02-20 Surface Casing Operation Performed
2002-02-21 Finished Drilling
2002-02-21 Well Log Performed
2002-02-22 Production Casing Operation Performed
2002-02-22 Rig Released
2002-02-22 Well Mode changed to Drilled and Cased
2002-05-08 Perforation Treatment Performed - Jet Perforation
2002-05-09 Well Log Performed
2002-05-30 Well Began Production
2002-05-30 Well Fluid changed to Crude Oil
2002-05-30 Well Mode changed to Pumping
2003-06-14 Well Log Performed
2003-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-03 Plug Back Performed
2003-10-03 Well Fluid changed to Crude Oil
2003-10-03 Well Mode changed to Abandoned Zone
2003-10-04 Well Log Performed
2019-07-30 Well Abandoned
2019-07-30 Well Fluid changed to Crude Oil
2019-07-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-20 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-08 Perforation 876.00 878.00 17
2002-05-08 Perforation 880.50 882.00 17
2003-10-03 Packing Device Capped w/Cement 862.00 870.00 0
2003-10-03 Packing Device Capped w/Cement 842.00 850.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4905 0.0 0.0 0.0
2003 2916 0.0 0.0 0.0

For data sources see[6]

References