X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032310B02

Well Details

Well ID: 0404032310B02
Loading map...
Location: B0/10-23-040-03W4/2
Location Alias: B0/10-23-40-03 W4M
Location Alias 2: B0/10-23-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 23
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1B0 PROVOST 10-23-40-3
Operator Name: West Lake Energy Corp.
License Number: 0175851
License Date: 1995-02-07
License Status: Suspension
Spud Date: 1995-05-21
Final Drill Date: 1995-05-23
Well Total Depth: 859.00 m
Surface Hole Latitude: 52.456524
Surface Hole Longitude: -110.329559

For data sources see[1][2]

Well History

Date Event
1995-02-07 Obtained License
1995-05-21 Surface Casing Operation Performed
1995-05-22 Direction Drilling Operation Performed - Deviate
1995-05-23 Finished Drilling
1995-05-23 Well Log Performed
1995-05-23 Well Mode changed to Drilled and Cased
1995-05-24 Production Casing Operation Performed
1995-05-24 Rig Released
1995-07-31 Well Log Performed
1995-08-02 Well Log Performed
1995-08-04 Perforation Treatment Performed - Jet Perforation
1996-11-22 Perforation Treatment Performed - Cement Squeeze
1996-11-28 Perforation Treatment Performed - Jet Perforation
1996-11-28 Well Log Performed
1996-12-13 Well Log Performed
2007-06-27 Perforation Treatment Performed - Jet Perforation
2007-06-27 Well Log Performed
2007-06-30 Well Began Production
2007-06-30 Well Fluid changed to Crude Oil
2007-06-30 Well Mode changed to Pumping
2009-08-04 Well Fluid changed to Crude Oil
2009-08-04 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-05-22 108.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-04 Perforation 809.80 811.50 18
1995-08-04 Perforation 812.10 813.30 18
1996-11-22 Cement Squeeze 809.80 813.30 0
1996-11-28 Perforation 809.00 811.50 17
2007-06-27 Perforation 802.00 803.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 4440 0.0 0.0 0.0
2008 3238 0.0 0.0 0.0

For data sources see[6]

References