X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032708000

Well Details

Well ID: 0404032708000
Loading map...
Location: 00/08-27-040-03W4/0
Location Alias: 00/08-27-40-03 W4M
Location Alias 2: 00/08-27-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 27
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 8D PROVOST 8-27-40-3
Operator Name: West Lake Energy Corp.
License Number: 0255603
License Date: 2001-05-29
License Status: Suspension
Spud Date: 2001-06-08
Final Drill Date: 2001-06-09
Well Total Depth: 794.00 m
Surface Hole Latitude: 52.468928
Surface Hole Longitude: -110.343236

For data sources see[1][2]

Well History

Date Event
2001-05-29 Obtained License
2001-06-08 Surface Casing Operation Performed
2001-06-09 Finished Drilling
2001-06-10 Production Casing Operation Performed
2001-06-10 Well Log Performed
2001-06-11 Rig Released
2001-06-11 Well Mode changed to Drilled and Cased
2001-06-14 Perforation Treatment Performed - Jet Perforation
2001-06-14 Well Log Performed
2001-07-06 Well Began Production
2001-07-06 Well Fluid changed to Crude Oil
2001-07-06 Well Mode changed to Pumping
2001-07-18 Perforation Treatment Performed - Jet Perforation
2001-07-18 Well Log Performed
2001-07-19 Perforation Treatment Performed - Cement Squeeze
2001-07-21 Perforation Treatment Performed - Jet Perforation
2001-07-21 Well Log Performed
2001-07-23 Perforation Treatment Performed - Cement Squeeze
2001-07-26 Well Log Performed
2001-07-27 Well Log Performed
2001-07-29 Perforation Treatment Performed - Jet Perforation
2001-07-29 Well Log Performed
2008-03-01 Well Fluid changed to Crude Oil
2008-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-14 Perforation 767.00 768.00 14
2001-07-18 Perforation 771.00 771.30 39
2001-07-19 Cement Squeeze 771.00 771.30 0
2001-07-19 Cement Squeeze 767.00 768.00 0
2001-07-21 Perforation 767.00 768.00 14
2001-07-23 Cement Squeeze 767.00 768.00 0
2001-07-29 Perforation 767.00 767.60 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4052 0.0 0.0 0.0
2002 8596 0.0 0.0 0.0
2003 8482 0.0 0.0 0.0
2004 8567 0.0 0.0 0.0
2005 8194 0.0 0.0 0.0
2006 8388 0.0 0.0 0.0
2007 8675 0.0 0.0 0.0
2008 1094 0.0 0.0 0.0

For data sources see[5]

References