If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404032811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.473226,"lon":-110.380172,"icon":""}]} |
Location: 00/11-28-040-03W4/0 | |
Location Alias: 00/11-28-40-03 W4M | |
Location Alias 2: 00/11-28-040-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CAIRN ET AL DAVID 11-28-40-3 | |
Operator Name: Dynamar Energy Limited | |
License Number: 0111432 | |
License Date: 1984-12-06 | |
License Status: RecCertified | |
Spud Date: 1985-01-04 | |
Final Drill Date: 1985-01-06 | |
Well Total Depth: 840.00 m | |
Surface Hole Latitude: 52.473226 | |
Surface Hole Longitude: -110.380172 |
Date | Event |
---|---|
1984-12-06 | Obtained License |
1985-01-04 | Surface Casing Operation Performed |
1985-01-06 | Finished Drilling |
1985-01-06 | Well Log Performed |
1985-01-06 | Well Mode changed to Drilled and Cased |
1985-01-07 | Production Casing Operation Performed |
1985-01-07 | Rig Released |
1985-01-14 | Well Log Performed |
1985-01-15 | Perforation Treatment Performed - Jet Perforation |
1985-01-15 | Well Log Performed |
1985-02-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1985-02-10 | Well Log Performed |
1985-02-25 | Well Began Production |
1985-02-25 | Well Fluid changed to Crude Oil |
1985-02-25 | Well Mode changed to Pumping |
1985-07-18 | Perforation Treatment Performed - Jet Perforation |
1985-07-19 | Well Log Performed |
1990-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-12-05 | Plug Back Performed |
1990-12-05 | Well Abandoned |
1990-12-05 | Well Fluid changed to Crude Oil |
1990-12-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-01-15 | Perforation | 772.00 | 773.00 | 7 |
1985-02-10 | Hydra Jet Perforation | 772.00 | 773.00 | 0 |
1985-07-18 | Perforation | 775.00 | 776.50 | 13 |
1990-12-05 | Packing Device Capped w/Cement | 755.00 | 765.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 2678 | 0.0 | 0.0 | 0.0 |
1986 | 3936 | 0.0 | 0.0 | 0.0 |
1987 | 8521 | 0.0 | 0.0 | 0.0 |
1988 | 7751 | 0.0 | 0.0 | 0.0 |
For data sources see[5]